
Ecology home > Watershed Planning >
Reanette Boese
Spokane County Public Works Department, Utilities Division
(509) 477-7678
rboese@spokanecounty.org
Sara Hunt
Department of Ecology
(509) 329-3579
sarh461@ecy.wa.gov
Since plan adoption, the group has:
Instream Flow Status
Instream flows were set in 1976 for the Little Spokane River (Chapter 173-555 WAC). The planning group approved instream flow recommendations for the river at Barker Road and for aesthetic and recreational flows in the watershed plan. Further instream flow data collection was completed for the Middle and Lower Spokane River in May 2007.
The joint WRIA 54 and 55/57 instream flow work group collaborated on instream flow recommendations for the entire Spokane River, integrating the research from the recent studies with those completed in 2004 and during the Avista FERC relicensing process. The work group did not achieve consensus on minimum instream flows for the main stem Spokane River. However, they did agree upon control points to manage surface water and the Spokane Valley/Rathdrum Prairie aquifer.
The State Caucus recommendations for minimum instream flows were used as the foundation for conditions in the Section 401 water quality certification of the Avista hydroelectric dam relicense. The State Caucus is developing recommendations for spring spawning flows and delineating the boundary of the Spokane Valley/Rathdrum Prairie aquifer that would be associated with a future instream flow rule.
Washington State Department of Ecology home page
Please send additions or corrections to Chris Anderson, (360) 407-6634.
Copyright © Washington State Department of Ecology. See http://www.ecy.wa.gov/copyright.html.