|
|
Beyond Waste home >
Navigate to a plan section >
What Washington will look like in 30 Years-Hazardous Waste System Issues, Permitting/Corrective Action
What Washington will look like in 30 years
Permitting/Corrective Action
The future of permitting/corrective action activities for the HWTR Program is directed toward the following goals to maximize effectiveness and achieve the Beyond Waste vision:
- Ensure Full Financial Responsibility
Hazardous waste management and recycling facilities assume full financial responsibility for facility closures and corrective action cleanups.
- Acquire More Technical Assistance
Ecology seeks technical assistance from EPA on financial assurance, including cost modeling.
- Educate The Public
The public is aware of the possible risks and costs of waste mismanagement at facilities handling hazardous wastes.
- Transform Existing TSDs
As the goals of Beyond Waste are met and the need for waste management facilities diminishes, TSDs are provided with technical assistance to allow them to mature into “second generation” TSDs. Second generation TSDs provide treatment (reclamation, reuse, or recovery for beneficial value) of wastes that have not been eliminated, or stocking and distribution of reusable materials for industrial and commercial uses.
<-- Back
Next -->
|
Copyright © Washington State Department of Ecology. See http://www.ecy.wa.gov/copyright.html.