
| Title | Quality Assurance Project Plan: Lower Yakima River Water Quality Model and Evaluation of the USBR Columbia River Pump Exchange Project | |
| Month-Year Published | December 2000 | |
| Online Availability |
1235 kilobytes, requires version 4.0 or later of Adobe Acrobat Reader Software get Acrobat Reader
| |
| Short Description |
This is the Quality Assurance Project Plan for the study, Lower Yakima River Water Quality Model and Evaluation of the USBR Columbia River Pump Exchange Project | |
| Publication Number | 00-03-095 | |
| Author(s) | Carroll, J. and J. Joy | |
| Print Availability | ||
| Number of pages | 21 pp. | |
| Keywords | change, Columbia River, evaluation, model, plan, quality assurance, quality assurance project plan, river, study, water, water quality | |
Copyright © Washington State Department of Ecology. See http://www.ecy.wa.gov/copyright.html.