
| Title | Gibbons Creek Watershed -- Fecal Coliform Total Maximum Daily Load Submittal Report | |
| Month-Year Published | June 2000 | |
| Online Availability |
4196 kilobytes, requires version 4.0 or later of Adobe Acrobat Reader Software get Acrobat Reader
| |
| Short Description |
The Washington State Department of Ecology (Ecology) is establishing a Total Maximum Daily Load (TMDL) for Gibbons Creek watershed for fecal coliform bacteria. This TMDL will address potential impairments of beneficial uses in the watershed listed in the 1998 Section 303(d) list of impaired surface waters. | |
| Publication Number | 00-10-039 | |
| Author(s) | Post, R. | |
| Print Availability | ||
| Number of pages | 36 | |
| Keywords | 303(d), creek, fecal coliform, Total Maximum Daily Load, water, watershed | |
| Related Publications | Title | Relationship |
| Gibbons Creek Watershed Fecal Coliform Total Maximum Daily Load (Water Cleanup Plan): Detailed Implementation Plan | related publication | |
This page last updated August 11, 2011
Copyright © Washington State Department of Ecology. See http://www.ecy.wa.gov/copyright.html.