Publication Summary

Title

Quality Assurance Project Plan: Mid Columbia and Snake Rivers Total Dissolved Gas TMDL Field Monitoring

Month-Year PublishedJuly 2002
Online Availability
View this publication in Acrobat PDF format
169 kilobytes,  requires version 4.0 or later of Adobe Acrobat Reader Software  get Acrobat Reader
Short Description

This Quality Assurance Project Plan addresses total dissolved gas monitoring to be conducted at Wells Dam on the Columbia River and Lower Granite Dam on the Snake River as part of the development of total maximum daily loads on the Columbia and Snake Rivers. Data will be collected with multi-parameter data logging meters. Secondary parameters also will be monitored: dissolved oxygen, temperature, pH, and specific conductance. Monitoring is planned for the May through July spring runoff period.

Publication Number02-03-067
Author(s)Pickett, P.
Print Availability
Request from the program.
Number of pages 9 pp. + app (13 total)
Keywords Columbia River, monitoring, plan, quality assurance, quality assurance project plan, river, Snake River, TMDL, wells
Subject Waterbodies
Columbia River,
Snake River
map of Washington state showing locations of subject waterbodies
Related Publications TitleRelationship    
Total Maximum Daily Load for Lower Snake River Total Dissolved Gassimilar topic

This page last updated March 10, 2008