
| Title | Quality Assurance Project Plan: Mid Columbia and Snake Rivers Total Dissolved Gas TMDL Field Monitoring | |||
| Month-Year Published | July 2002 | |||
| Online Availability |
169 kilobytes, requires version 4.0 or later of Adobe Acrobat Reader Software get Acrobat Reader
| |||
| Short Description |
This Quality Assurance Project Plan addresses total dissolved gas monitoring to be conducted at Wells Dam on the Columbia River and Lower Granite Dam on the Snake River as part of the development of total maximum daily loads on the Columbia and Snake Rivers. Data will be collected with multi-parameter data logging meters. Secondary parameters also will be monitored: dissolved oxygen, temperature, pH, and specific conductance. Monitoring is planned for the May through July spring runoff period. | |||
| Publication Number | 02-03-067 | |||
| Author(s) | Pickett, P. | |||
| Print Availability | ||||
| Number of pages | 9 pp. + app (13 total) | |||
| Keywords | Columbia River, monitoring, plan, quality assurance, quality assurance project plan, river, Snake River, TMDL, wells | |||
| Subject Waterbodies |
| |||
| Related Publications | Title | Relationship | ||
| Total Maximum Daily Load for Lower Snake River Total Dissolved Gas | similar topic | |||
Copyright © Washington State Department of Ecology. See http://www.ecy.wa.gov/copyright.html.