
| Title | Washington State Wetland Mitigation Evaluation Study - Phase 2, Evaluating Success | |
| Month-Year Published | February 2002 | |
| Online Availability |
1087 kilobytes, requires version 4.0 or later of Adobe Acrobat Reader Software get Acrobat Reader
| |
| Short Description |
The Washington State Wetland Mitigation Evaluation Study was developed in two phases to evaluate the success of projects intended to compensate (mitigate) for wetlands lost to development activities in the state of Washington. Phase 1 of the study, conducted in the fall of 1999, examined the compliance of 45 randomly selected projects with their permit requirements. Phase 2 examined the ecological success of a subset of the projects from Phase 1. The study did not include any Washington State Department of Transportation mitigation projects. (Also see abstract below) | |
| Publication Number | 02-06-009 | |
| Author(s) | Patricia Johnson, Dana L. Mock, Andy McMillan, Lauren Driscoll, Tom Hruby | |
| Contact | Dana L. Mock, (360) 407-6947 | |
| Print Availability |
A CD with this document and related publications is also available. Contact Dana L. Mock.
| |
| Number of pages | 157 | |
| Keywords | evaluation, mitigation, study, transport, transportation, wetland, wetland mitigation | |
| Related Web Content | Ecology's Wetlands home page | |
| Related Publications | Title | Relationship |
| Washington State Wetland Mitigation Evaluation Study, Phase I: Compliance | part of a series | |
| Appendix F: Project Summaries for the Washington State Wetland Mitigation Evaluation Study - Phase 2: Evaluating Success | supporting publication | |
| Abstract | Long Description |
The Washington State Wetland Mitigation Evaluation Study was developed in two phases to evaluate the success of projects intended to compensate (mitigate) for wetlands lost to development activities in the state of Washington. Phase 1 of the study, conducted in the fall of 1999, examined the compliance of 45 randomly selected projects with their permit requirements. Phase 2 examined the ecological success of a subset of the projects from Phase 1. The study did not include any Washington State Department of Transportation mitigation projects. Over all, 24 compensatory wetland-mitigation projects (at 31 sites) were evaluated in Phase 2. Eighteen projects were located west of the Cascade Mountains, and six projects were located east of the Cascade crest. The goal of Phase 2 of the Wetland Mitigation Evaluation Study was to determine the success of wetland mitigation projects from an ecological perspective. |
This page last updated August 11, 2011
Copyright © Washington State Department of Ecology. See http://www.ecy.wa.gov/copyright.html.