
| Title | Focus on Construction Stormwater General Permit | |
| Month-Year Published | October 2002 | |
| Revised on | June 2003 | |
| Online Availability |
30 kilobytes, requires version 4.0 or later of Adobe Acrobat Reader Software get Acrobat Reader
| |
| Short Description |
This handout was used during the workshops for the Eastern Washington Stormwater Manual and Model Program. The Washington State Department of Ecology (Ecology) is in the process of updating and reissuing the National Pollutant Discharge Elimination System (NPDES) and state waste discharge general permit for stormwater discharges associated with construction activities five acres or larger. This is commonly referred to as the "Construction Stormwater General Permit." | |
| Publication Number | 02-10-054 | |
| Author(s) | Jeff Killelea | |
| Print Availability |
Not available as a printed document
Please use your personal computer to print this two-page document. Thank you.
| |
| Number of pages | 2 | |
| Keywords | construction, Construction Stormwater General Permit, discharge, General Permit, national pollutant discharge elimination system, permit, pollutant, stormwater, Stormwater General Permit, waste | |
| Related Web Content | Stormwater Homepage | |
| Related Publications | Title | Relationship |
| Focus on Industrial Stormwater General Permit | part of a series | |
| Frequently Asked Questions about Underground Injection Control (UIC) Program Rule Revisions | part of a series | |
This page last updated August 11, 2011
Copyright © Washington State Department of Ecology. See http://www.ecy.wa.gov/copyright.html.