Publication Summary

Title

Quality Assurance Project Plan: Addendum to Operation and Maintenance Manual of the Treatment Lagoon, Palermo Wellfield Superfund Site

Month-Year PublishedMarch 2003
Online Availability
View this publication in Acrobat PDF format
1993 kilobytes,  requires version 4.0 or later of Adobe Acrobat Reader Software  get Acrobat Reader
Short Description

This is the Quality Assurance Project Plan for the Addendum to the Operation and Maintenance Manual of the Treatment Lagoon, Palermo Wellfield Superfund Site

Publication Number03-03-101
Author(s)Marti, P.
Print Availability
Request from the program.
Number of pages 6 + attachments (95 total)
Keywords addendum, manual, plan, quality, quality assurance, quality assurance project plan, Superfund, treatment
Subject Waterbodies
Deschutes River
map of Washington state showing locations of subject waterbodies
Related Publications TitleRelationship    
Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon Status Report, December 2002 and May 2003parent publication
Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon, Status Report, October 2003 and May 2004similar topic
Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon, Status Report, September 2004 and June 2005similar topic
Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon, Status Report, September 2005 and June 2006similar topic
Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon, Status Report, November 2006 and June 2007similar topic
Palermo Wellfield Superfund Site: Subdrain System and Treatment Lagoon, Status Results, October 2007 and June and November 2008part of a series

This page last updated August 31, 2009