Publication Summary

Title

Quality Assurance Project Plan: Total Maximum Daily Load Study for DDT Contamination and Transport in the Lower Mission Creek Basin, Chelan County, Washington

Month-Year PublishedApril 2003
Online Availability
View this publication in Acrobat PDF format
752 kilobytes,  requires version 4.0 or later of Adobe Acrobat Reader Software  get Acrobat Reader
Short Description

This is a quality assurance project plan for the Total Maximum Daily Load Study: DDT Contamination and Transport in the Lower Mission Creek Basin, Chelan County, Washington.

Publication Number03-03-103
Author(s)Serdar, D. and B. Era-Miller
Print Availability
Request from the program.
Number of pages 31 pp.
Keywords basin, contamination, county, creek, DDT, Mission, plan, quality assurance, quality assurance project plan, study, Total Maximum Daily Load, transport
Subject Waterbodies
Mission Creek
map of Washington state showing locations of subject waterbodies
Related Publications TitleRelationship    
DDT Contamination and Transport in the Lower Mission Creek Basin, Chelan County: Total Maximum Daily Load Assessmentsimilar topic

This page last updated March 10, 2008