
| Title | Quality Assurance Project Plan: Stormwater Quality Survey of Western Washington Construction Sites | |
| Month-Year Published | November 2003 | |
| Online Availability |
451 kilobytes, requires version 4.0 or later of Adobe Acrobat Reader Software get Acrobat Reader
| |
| Short Description |
This is the Quality Assurance Project Plan for the Stormwater Quality Survey of Western Washington Construction Sites. (Also see abstract below) | |
| Publication Number | 03-03-111 | |
| Author(s) | Golding, S. | |
| Print Availability | ||
| Number of pages | 17 pp. + app (24 total) | |
| Keywords | construction, facilities, plan, quality, quality assurance, quality assurance project plan, results, stormwater, survey, water | |
| Related Publications | Title | Relationship |
| Interim Report: Stormwater Quality Survey of Western Washington Construction Sites | similar topic | |
| Stormwater Quality Survey of Western Washington Construction Sites, 2003-2005 | part of a series | |
| Abstract | Long Description |
There is a need for systematic, representative data to characterize stormwater discharged from construction sites. This survey of 60 western Washington construction sites will provide a quantitative description of stormwater quality. Facilities are to be monitored during the wet season from November 1, 2003 to April 30, 2004. The impacts of construction site discharges on receiving water will be investigated. Site characteristics will be compared and correlated with stormwater discharge quality. Turbidity will be compared and correlated with total suspended solids and transparency tube results. Results will be summarized in a report intended for both technical and non-technical audiences. |
Copyright © Washington State Department of Ecology. See http://www.ecy.wa.gov/copyright.html.