Publication Summary

Title

Granger Drain Fecal Coliform Bacteria Total Maximum Daily Load: Detailed Implementation Plan

Month-Year PublishedJanuary 2003
Online Availability
View this publication in Acrobat PDF format
185 kilobytes,  requires version 4.0 or later of Adobe Acrobat Reader Software  get Acrobat Reader
Short Description

The Detailed Implementation Plan (DIP) details how and when fecal coliform (FC) bacteria reductions will be achieved in order to meet Washington State water quality standards in the mainstem Granger Drain and the Sunnyside Valley Irrigation District (SVID) irrigation supply canal.

Publication Number03-10-004
Author(s)Greg Bohn
Print Availability
Request from the program.
Number of pages 32
Keywords bacteria, fecal coliform, Granger Drain, implementation, implementation plan, irrigation, order, plan, Total Maximum Daily Load, water
Subject Waterbodies
WRIA 37 - Lower Yakima
map of Washington state showing locations of subject waterbodies
Related Publications TitleRelationship    
Granger Drain Fecal Coliform Bacteria Total Maximum Daily Load Assessment and Evaluation -- FINALsupporting publication
Granger Drain Fecal Coliform Bacteria Total Maximum Daily Load -- Submittal Reportsupporting publication

This page last updated March 10, 2008