
| Title | Upper Humptulips River Temperature Total Maximum Daily Load: Detailed Implementation Plan | |||
| Month-Year Published | May 2003 | |||
| Revised on | July 2003 | |||
| Online Availability |
1966 kilobytes, requires version 4.0 or later of Adobe Acrobat Reader Software get Acrobat Reader
| |||
| Short Description |
This document is the Detailed Implementation Plan (DIP) for the Upper Humptulips River. It is based on the findings of the East/West Humptulips Watershed Analysis (Rayonier, draft), and the Upper Humptulips River Watershed Temperature Total Maximum Daily Load (Water Cleanup Plan) Submittal Report (Peredney et.al, 2001), referred to in this document as "the TMDL" the Upper Humptulips River Watershed Temperature Total Maximum Daily Load Study Technical Report (Cleland et.al, 2001). | |||
| Publication Number | 03-10-042 | |||
| Author(s) | Craig Graber | |||
| Print Availability |
To conserve resources, limited quantities of this publication are available in print. To save and view the document on your personal computer, right click on the link to the document and select "save target as."
| |||
| Number of pages | 89 | |||
| Keywords | cleanup, implementation plan, study, technical, temperature, Total Maximum Daily Load, water cleanup plan, watershed | |||
| Subject Waterbodies |
| |||
| Related Web Content | TMDLs by Watershed Homepage | |||
| Related Publications | Title | Relationship | ||
| Focus on Upper Humptulips River | supporting publication | |||
Copyright © Washington State Department of Ecology. See http://www.ecy.wa.gov/copyright.html.