Publication Summary

Title

Upper Humptulips River Temperature Total Maximum Daily Load: Detailed Implementation Plan

Month-Year PublishedMay 2003
Revised onJuly 2003
Online Availability
View this publication in Acrobat PDF format
1966 kilobytes,  requires version 4.0 or later of Adobe Acrobat Reader Software  get Acrobat Reader
Short Description

This document is the Detailed Implementation Plan (DIP) for the Upper Humptulips River. It is based on the findings of the East/West Humptulips Watershed Analysis (Rayonier, draft), and the Upper Humptulips River Watershed Temperature Total Maximum Daily Load (Water Cleanup Plan) Submittal Report (Peredney et.al, 2001), referred to in this document as "the TMDL" the Upper Humptulips River Watershed Temperature Total Maximum Daily Load Study Technical Report (Cleland et.al, 2001).

Publication Number03-10-042
Author(s)Craig Graber
Print Availability
Request from the program.
To conserve resources, limited quantities of this publication are available in print. To save and view the document on your personal computer, right click on the link to the document and select "save target as."
Number of pages 89
Keywords cleanup, implementation plan, study, technical, temperature, Total Maximum Daily Load, water cleanup plan, watershed
Subject Waterbodies
Humptulips River,
E.F.,
Humptulips River,
W.F.
map of Washington state showing locations of subject waterbodies
Related Web ContentTMDLs by Watershed Homepage
Related Publications TitleRelationship    
Focus on Upper Humptulips Riversupporting publication

This page last updated March 10, 2008