
| Title | Upper Yakima River Basin Suspended Sediment, Turbidity and Organochlorine Pesticide Total Maximum Daily Load: Detailed Implementation Plan | |||
| Month-Year Published | December 2003 | |||
| Online Availability |
563 kilobytes, requires version 4.0 or later of Adobe Acrobat Reader Software get Acrobat Reader
| |||
| Short Description |
This detailed implementation plan (DIP) document outlines the steps that will be taken in an effort to reduce levels of suspended sediment, turbidity and organochlorine pesticides1 in the upper Yakima River basin, in central Washington State. This document expands the sediment and pesticide reduction strategies found in earlier reports written for the Upper Yakima River Basin Suspended Sediment, Turbidity and Organochlorine Pesticides Total Maximum Daily Load (TMDL). This DIP also specifies the ways in which implementation activities may reduce these pollutants and generally improve stream ?health.? Lastly, the DIP explains how water quality monitoring will be used to track progress and to indicate when adaptive management procedures may need to be employed. | |||
| Publication Number | 03-10-058 | |||
| Author(s) | Jane Creech | |||
| Print Availability |
To conserve resources, limited quantities of this publication are available in print. To save and view the document on your personal computer, right click on the link to the document and select "save target as."
| |||
| Number of pages | 59 | |||
| Keywords | basin, implementation plan, organochlorine, pesticide, pesticides, plan, river, sediment, suspended sediment, Total Maximum Daily Load | |||
| Subject Waterbodies |
| |||
Copyright © Washington State Department of Ecology. See http://www.ecy.wa.gov/copyright.html.