Publication Summary

Title

Quality Assurance Project Plan: Pend Oreille River Total Dissolved Gas Total Maximum Daily Load Technical Study

Month-Year PublishedMay 2004
Online Availability
View this publication in Acrobat PDF format
839 kilobytes,  requires version 4.0 or later of Adobe Acrobat Reader Software  get Acrobat Reader
Short Description

This is the Quality Assurance Project Plan for the study, Pend Oreille River Total Dissolved Gas Total Maximum Daily Load Technical Study.

(Also see abstract below)
Publication Number04-03-107
Author(s)Pickett, P.
Print Availability
Request from the program.
Number of pages 26 pp.
Keywords dam, gas, plan, quality assurance, quality assurance project plan, river, study, technical, Total Maximum Daily Load
Subject Waterbodies
Pend Oreille River
map of Washington state showing locations of subject waterbodies
Related Publications TitleRelationship    
Pend Oreille River Total Dissolved Gas Total Maximum Daily Load: Water Quality Improvement Reportsimilar topic
Abstract Long Description

This Quality Assurance Project Plan describes monitoring for Total Dissolved Gas (TDG) in the Pend Oreille River in Washington State, to be used in development of a TDG Total Maximum Daily Load (TMDL). TDG will be monitored continuously in the Pend Oreille River near Ruby, about halfway between Newport and Box Canyon Dam. TDG will also be measured at regular intervals from April through July as paired readings with other meters operated by dam owners above Newport and at Box Canyon and Boundary Dams, as well as at the Ecology meter. Data quality, analytical, and reporting procedures are also described.

Link to EIM data for User Study ID PPIC0007


This page last updated March 10, 2008