
| Title | Quality Assurance Project Plan: Pend Oreille River Total Dissolved Gas Total Maximum Daily Load Technical Study | |||
| Month-Year Published | May 2004 | |||
| Online Availability |
839 kilobytes, requires version 4.0 or later of Adobe Acrobat Reader Software get Acrobat Reader
| |||
| Short Description |
This is the Quality Assurance Project Plan for the study, Pend Oreille River Total Dissolved Gas Total Maximum Daily Load Technical Study. (Also see abstract below) | |||
| Publication Number | 04-03-107 | |||
| Author(s) | Pickett, P. | |||
| Print Availability | ||||
| Number of pages | 26 pp. | |||
| Keywords | dam, gas, plan, quality, quality assurance, quality assurance project plan, river, study, technical, Total Maximum Daily Load | |||
| Subject Waterbodies |
| |||
| Related Publications | Title | Relationship | ||
| Pend Oreille River Total Dissolved Gas Total Maximum Daily Load: Water Quality Improvement Report | similar topic | |||
| Abstract | Long Description |
This Quality Assurance Project Plan describes monitoring for Total Dissolved Gas (TDG) in the Pend Oreille River in Washington State, to be used in development of a TDG Total Maximum Daily Load (TMDL). TDG will be monitored continuously in the Pend Oreille River near Ruby, about halfway between Newport and Box Canyon Dam. TDG will also be measured at regular intervals from April through July as paired readings with other meters operated by dam owners above Newport and at Box Canyon and Boundary Dams, as well as at the Ecology meter. Data quality, analytical, and reporting procedures are also described. |
||
Copyright © Washington State Department of Ecology. See http://www.ecy.wa.gov/copyright.html.