| Title | Quality Assurance Project Plan: Stormwater Quality Survey of Western Washington Construction Sites: Year 2 | |
| Month-Year Published | December 2004 | |
| Online Availability |
318 kilobytes, requires version 4.0 or later of Adobe Acrobat Reader Software get Acrobat Reader
| |
| Short Description |
This is the quality assurance project plan for the Stormwater Quality Survey of Western Washington Construction Sites: Year 2. (Also see abstract below) | |
| Publication Number | 04-03-118 | |
| Author(s) | Golding, S. | |
| Print Availability | ||
| Number of pages | 24 pp. | |
| Keywords | construction, quality assurance project plan, stormwater, survey, water | |
| Abstract | Long Description |
This is the second year of a two year project to characterize stormwater discharged from western Washington construction sites, surveying 45 construction sites to provide a quantitative description of stormwater quality. Sites are to be monitored during the wet season from November 1, 2004, to April 30, 2005. The impacts of construction site discharges on receiving water will be investigated. Site characteristics will be compared and correlated with stormwater discharge quality. Turbidity will be compared and correlated with transparency tube results. Results will be summarized in a report intended for both technical and non-technical audiences. |
Copyright © Washington State Department of Ecology. See http://www.ecy.wa.gov/copyright.html.