Publication Summary

Title

Quality Assurance Project Plan: Stormwater Quality Survey of Western Washington Construction Sites: Year 2

Month-Year PublishedDecember 2004
Online Availability
View this publication in Acrobat PDF format
318 kilobytes,  requires version 4.0 or later of Adobe Acrobat Reader Software  get Acrobat Reader
Short Description

This is the quality assurance project plan for the Stormwater Quality Survey of Western Washington Construction Sites: Year 2.

(Also see abstract below)
Publication Number04-03-118
Author(s)Golding, S.
Print Availability
Request from the program.
Number of pages 24 pp.
Keywords construction, quality assurance project plan, stormwater, survey, water
Abstract Long Description

This is the second year of a two year project to characterize stormwater discharged from western Washington construction sites, surveying 45 construction sites to provide a quantitative description of stormwater quality. Sites are to be monitored during the wet season from November 1, 2004, to April 30, 2005. The impacts of construction site discharges on receiving water will be investigated. Site characteristics will be compared and correlated with stormwater discharge quality. Turbidity will be compared and correlated with transparency tube results. Results will be summarized in a report intended for both technical and non-technical audiences.

Link to EIM data for User Study ID SGOL008


This page last updated October 22, 2008