Publication Summary

Title

I & J Waterway Site

Month-Year PublishedOctober 2004
Online Availability
View this publication in Acrobat PDF format
139 kilobytes,  requires version 4.0 or later of Adobe Acrobat Reader Software  get Acrobat Reader
Short Description

The Washington Department of Ecology (Ecology) and the Port of Bellingham (Port) have negotiated a draft legal agreement (called an agreed order) to perform an environmental study (called a remedial investigation/feasibility study) at the I&J Waterway site in Bellingham, Washington. The agreed order outlines the work to be performed and ensures the site investigation and cleanup activities are conducted in a timely fashion in accordance with all applicable laws and regulations. In addition to negotiating a draft agreed order with the Port, Ecology has developed a draft public participation plan outlining opportunities throughout the process for the public to provide input. The draft agreed order and draft public participation plan are currently available for public comment. Your comments on these proposed documents are welcome through November 26, 2004.

Publication Number04-09-113
Author(s)Mike Hogan
Print Availability
Request from the program.
Number of pages 3
Keywords agreed order, order, public comment, sediment, waterway
Location(s)
Bellingham
map of Washington state showing place locations

This page last updated March 10, 2008