Publication Summary

Title

Hanford Air Operating Permit: Responsiveness Summary for the Downgrade of the B-Plant Status Comment Period

Month-Year PublishedJanuary 2006
Online Availability
View this publication in Acrobat PDF format
437 kilobytes,  requires version 4.0 or later of Adobe Acrobat Reader Software  get Acrobat Reader
Short Description

The Washington State Department of Ecology (Ecology) encouraged the public to comment on the downgrade of the status of the Hanford B-Plant Stack from a "major stack" to a "minor stack" during a public comment period held October 10 through November 9, 2005. The US Department of Energy (USDOE) requested this change after determining that potential emissions from the Hanford B-Plant Stack will not exceed the maximum exposure limits set for minor stacks. This change will reduce the required level of monitoring from continuous to a single four-week sample a year. A Responsiveness Summary was created for this comment period.

Publication Number05-05-012
Author(s)Tanya Williams
Print Availability
Request from the program.
Number of pages 12
Keywords air, Columbia River, Hanford, permit, responsiveness summary

This page last updated March 3, 2008