Publication Summary

Title

Selah Ditch Multiparameter Total Maximum Daily Load: Technical Assessment

Month-Year PublishedFebruary 2005
Online Availability
View this publication in Acrobat PDF format
1910 kilobytes,  requires version 4.0 or later of Adobe Acrobat Reader Software  get Acrobat Reader
Short Description

This publication is the technical assessment report for the Selah Ditch Multiparameter Total Maximum Daily Load

Publication Number05-10-020
Author(s)Gregory Bohn
Print Availability Not available as a printed document
This publication is not available as a printed document. To save and view the document on your personal computer, right click on the link to the document and select "save target as."
Number of pages 71
Keywords assessment, technical, Total Maximum Daily Load
Subject Waterbodies
Selah Ditch
map of Washington state showing locations of subject waterbodies
Related Web ContentWater Cleanup Plans (TMDLs) by Watershed/Ecology Region

This page last updated October 8, 2008