
| Title | PCB Monitoring at Walla Walla Wastewater Treatment Plants | |||
| Month-Year Published | October 2006 | |||
| Online Availability |
199 kilobytes, requires version 4.0 or later of Adobe Acrobat Reader Software get Acrobat Reader
| |||
| Short Description |
This is the Quality Assurance Project Plan for the study, PCB Monitoring at Walla Walla Wastewater Treatment Plants. (Also see abstract below) | |||
| Publication Number | 06-03-114 | |||
| Author(s) | Johnson, A. | |||
| Print Availability | ||||
| Number of pages | 20 pp. | |||
| Keywords | monitoring, quality assurance project plan, river, Total Maximum Daily Load, wastewater treatment plant, water | |||
| Subject Waterbodies |
| |||
| Related Publications | Title | Relationship | ||
| PCB Monitoring at Walla Walla and College Place Wastewater Treatment Plants, 2006-07 | similar topic | |||
| Abstract | Long Description |
A Quality Assurance Project Plan is provided for monitoring polychlorinated biphenyls (PCBs) in influent and effluent from the Walla Walla and College Place wastewater treatment plants. The purpose of this effort is to establish whether these discharges currently exceed human health water quality criteria and to assess the extent to which the contamination is internal or external to each facility. This work is being done as a result of PCB wasteload allocations recently established through a Total Maximum Daily Load for the Walla Walla River. |
||
Copyright © Washington State Department of Ecology. See http://www.ecy.wa.gov/copyright.html.