
| Title | Lake Chelan Watershed DDT and PCB Total Maximum Daily Load: Water Quality Improvement Report | |||
| Month-Year Published | April 2006 | |||
| Online Availability |
1630 kilobytes, requires version 4.0 or later of Adobe Acrobat Reader Software get Acrobat Reader
| |||
| Short Description |
This TMDL establishes pollution reduction limits (load allocations) necessary to achieve water quality standards for DDT and PCBs in water bodies within the Lake Chelan watershed. The discussion includes a technical analysis, loading capacity, margin of safety, and appropriate appendices to establish these limits. | |||
| Publication Number | 06-10-022 | |||
| Author(s) | David Schneider and Randy Coots | |||
| Print Availability |
To conserve resources, limited quantities of this publication are available in print. To save and view the document on your personal computer, right click on the link to the document and select "save target as."
| |||
| Number of pages | 70 | |||
| Keywords | DDT, PCBs, quality, TMDL, Total Maximum Daily Load, water quality improvement | |||
| Subject Waterbodies |
| |||
| Related Web Content | Water Cleanup Plans (TMDLs) by Ecology Region - Central | |||
This page last updated August 11, 2011
Copyright © Washington State Department of Ecology. See http://www.ecy.wa.gov/copyright.html.