Publication Summary

Title

Addendum to the Quality Assurance Project Plan: Type N Experimental Buffer Treatment Study: Addressing Buffer Effectiveness on Riparian Inputs, Water Quality, and Exports to Fish-Bearing Waters in Basaltic Lithologies

Month-Year PublishedJune 2008
Online Availability
View this publication in Acrobat PDF format
69 kilobytes,  requires version 4.0 or later of Adobe Acrobat Reader Software  get Acrobat Reader
Short Description

This is an addendum to the study plan for the Type N Experimental Buffer Treatment Study: Addressing Buffer Effectiveness on Riparian Inputs, Water Quality, and Exports to Fish-Bearing Waters in Basaltic Lithologies.

(Also see abstract below)
Publication Number07-03-103ADD1
Author(s)Estrella, Stephanie
Print Availability
Request from the program.
Number of pages 8 pp.
Keywords addendum, buffer, fish, groundwater, quality, quality assurance, quality assurance project plan, riparian, treatment, water, water quality
Subject Waterbodies
Clearwater River,
Humptulips River,
E.F.,
Wishkah River,
North River,
Smith Creek,
Willapa River,
Nemah River,
North,
Grays River,
E.F.,
Skamokawa Creek,
Washougal River,
Hamilton Creek,
Wind River
map of Washington state showing locations of subject waterbodies
Related Publications TitleRelationship    
Quality Assurance Project Plan: Type N Experimental Buffer Treatment Study: Addressing Buffer Effectiveness on Riparian Inputs, Water Quality, and Exports to Fish-Bearing Waters in Basaltic Lithologiesparent publication
Abstract Long Description

The Groundwater/Forests and Fish Unit has been sampling the Type N Experimental Buffer Treatment (Type N) study sites since 2006. The most recent Quality Assurance (QA) Project Plan was completed in 2007 (Ehinger and Estrella) and our study objectives, design, and quality control procedures remain the same. The following changes, however, have been made since 2007:

--We are measuring additional water quality parameters from our sediment grab samples and turbidity threshold samples collected by the pump sampler.

--We have omitted bedload sampling from the study design.

This addendum documents these changes. The original QA Project Plan (Ehinger and Estrella, 2007) applies except as modified in this addendum.

Link to EIM data for User Study ID WEHI0000


This page last updated October 8, 2008