Publication Summary

Title

Quality Assurance Project Plan: Palouse River Temperature Total Maximum Daily Load Study

Month-Year PublishedJune 2007
Online Availability
View this publication in Acrobat PDF format
835 kilobytes,  requires version 4.0 or later of Adobe Acrobat Reader Software  get Acrobat Reader
Short Description

This is the study plan for the Palouse River Temperature Total Maximum Daily Load Study.

(Also see abstract below)
Publication Number07-03-106
Author(s)Kardouni, J.; J. Carroll; and K. Sinclair
Print Availability
Request from the program.
Number of pages 45 pp.
Keywords assessment, environmental, quality, quality assurance, quality assurance project plan, river, temperature, Total Maximum Daily Load, water
Subject Waterbodies
Palouse River
map of Washington state showing locations of subject waterbodies
Abstract Long Description

Section 303(d) of the federal Clean Water Act requires Washington State to prepare a list of all surface waters in the state for which beneficial uses of the water are impaired by pollutants. Waterbodies placed on the 303(d) list require the preparation of a Total Maximum Daily Load study to identify and quantify sources of the impairments and to recommend implementation strategies for reducing point (discrete) and nonpoint (diffuse) source loads.

The Palouse River is listed on the 303(d) list of impaired waterbodies for high instream temperatures. This Quality Assurance Project Plan describes the technical study that will (1) evaluate temperatures in the Palouse River during 2007, and (2) build on previous data collection efforts conducted by a variety of governmental and private organizations.

The study will be conducted by the Washington State Department of Ecology, Environmental Assessment Program.

Link to EIM data for User Study ID JICA0001


This page last updated October 8, 2008