Publication Summary

Title

Quality Assurance Project Plan: Yakima River Chlorinated Pesticides, PCBs, Suspended Sediment, and Turbidity Total Maximum Daily Load Study.

Month-Year PublishedJuly 2007
Online Availability
View this publication in Acrobat PDF format
1315 kilobytes,  requires version 4.0 or later of Adobe Acrobat Reader Software  get Acrobat Reader
Short Description

This is the plan for the Yakima River Chlorinated Pesticides, PCBs, Suspended Sediment, and Turbidity Total Maximum Daily Load Study.

(Also see abstract below)
Publication Number07-03-107
Author(s)Johnson, A.
Print Availability
Request from the program.
Number of pages 67 + app (74 total)
Keywords chlorinated, pesticide, quality, quality assurance project plan, river, suspended sediment, Total Maximum Daily Load, water
Subject Waterbodies
Yakima River
map of Washington state showing locations of subject waterbodies
Related Publications TitleRelationship    
Frequently Asked Questions: Yakima River Watershed Toxics Study:: Progress Updatesimilar topic
Abstract Long Description

A Quality Assurance Project Plan is provided for a one-year monitoring program to evaluate chlorinated pesticide, polychlorinated biphenyl (PCB), total suspended solids (TSS), and turbidity concentrations in the Yakima River. This is the next step in an ongoing cleanup initiated through the Total Maximum Daily Load (TMDL) process required by the Clean Water Act for waterbodies that do not meet standards. The results will be used to: 1) assess the effectiveness of the 1997 lower Yakima River Suspended Sediment and DDT TMDL; 2) identify sources and quantify loadings of chlorinated pesticides, PCBs, TSS, and turbidity; 3) recommend numerical targets that will result in the river and its tributaries meeting water quality standards; and 4) propose wasteload and load allocations for sources, as appropriate.

Link to EIM data for User Study ID AJOH0055

This page last updated November 10, 2009