
| Title | Quality Assurance Project Plan: Yakima River Chlorinated Pesticides, PCBs, Suspended Sediment, and Turbidity Total Maximum Daily Load Study. | |||
| Month-Year Published | July 2007 | |||
| Online Availability |
1315 kilobytes, requires version 4.0 or later of Adobe Acrobat Reader Software get Acrobat Reader
| |||
| Short Description |
This is the plan for the Yakima River Chlorinated Pesticides, PCBs, Suspended Sediment, and Turbidity Total Maximum Daily Load Study. (Also see abstract below) | |||
| Publication Number | 07-03-107 | |||
| Author(s) | Johnson, A. | |||
| Print Availability | ||||
| Number of pages | 67 + app (74 total) | |||
| Keywords | chlorinated, pesticide, quality, quality assurance project plan, river, suspended sediment, Total Maximum Daily Load, water | |||
| Subject Waterbodies |
| |||
| Related Publications | Title | Relationship | ||
| Frequently Asked Questions: Yakima River Watershed Toxics Study:: Progress Update | similar topic | |||
| Abstract | Long Description |
A Quality Assurance Project Plan is provided for a one-year monitoring program to evaluate chlorinated pesticide, polychlorinated biphenyl (PCB), total suspended solids (TSS), and turbidity concentrations in the Yakima River. This is the next step in an ongoing cleanup initiated through the Total Maximum Daily Load (TMDL) process required by the Clean Water Act for waterbodies that do not meet standards. The results will be used to: 1) assess the effectiveness of the 1997 lower Yakima River Suspended Sediment and DDT TMDL; 2) identify sources and quantify loadings of chlorinated pesticides, PCBs, TSS, and turbidity; 3) recommend numerical targets that will result in the river and its tributaries meeting water quality standards; and 4) propose wasteload and load allocations for sources, as appropriate. |
||
This page last updated November 10, 2009
Copyright © Washington State Department of Ecology. See http://www.ecy.wa.gov/copyright.html.