Publication Summary

Title

106-T Interim Barrier Comment Period Responsiveness Summary

Month-Year PublishedJuly 2007
Online Availability
View this publication in Acrobat PDF format
1035 kilobytes,  requires version 4.0 or later of Adobe Acrobat Reader Software  get Acrobat Reader
Short Description

Ecology held a comment period to get public input on a proposal to build a temporary cover over part of the T Tank Farm at Hanford. The project′s purpose is to inhibit the infiltration of rain and melting snow into the soil and significantly reduce the downward migration of a plume of contamination in the soil at the T Tank Farm. The comment period was from April 8 to May 7, 2007.

Publication Number07-05-003
Author(s)Joe Caggiano
Print Availability
Request from the program.
Number of pages 25
Keywords T-106, tank, Tank Farm, waste

This page last updated April 16, 2010