Publication Summary

Title

Everett Smelter Site -2007 Soil Cleanup Biweekly Newsletter #4

Month-Year PublishedJuly 2007
Online Availability
View this publication in Acrobat PDF format
307 kilobytes,  requires version 4.0 or later of Adobe Acrobat Reader Software  get Acrobat Reader
Note: For additional information see related web content below.
Short Description

What′s happening in your neighborhood? Ecology′s contractor, Wyser Construction, Inc. began cleanup work at the 10 homes located on the east side of Bridgeway in Everett, WA on May 21, 2007. The cleanup will remove and dispose of accessible soil contaminated with arsenic and lead. Soil is accessible if it is not under the house, paved driveways and walkways or patios. All accessible contaminated soil with arsenic levels above 20 mg/Kg that is within one foot of the surface will be removed and replaced with clean topsoil.

Publication Number07-09-078d
Author(s)Nancy Lui
ContactJerome Cruz, (425) 649-7094
Print Availability
Request from the program.
Number of pages 2
Keywords newsletter, smelter
Location(s)
Everett
map of Washington state showing place locations
Related Web ContentAdditional Information

This page last updated October 16, 2008