
| Title | Everett Smelter Site 2007 Soil Cleanup BI-WEEKLY NEWSLETTER #13 | |||
| Month-Year Published | November 2007 | |||
| Online Availability |
103 kilobytes, requires version 4.0 or later of Adobe Acrobat Reader Software get Acrobat Reader
Note: For additional information, see related web content below.
| |||
| Short Description |
Ecology′s contractor, Wyser Construction, Inc. began cleanup work at the 10 homes located on the east side of Bridgeway in Everett, WA on May 21, 2007. The cleanup will remove and dispose of accessible soil contaminated with arsenic and lead. Soil is accessible if it is not under the house, paved driveways and walkways, or patios. All accessible contaminated soil with arsenic levels above 20 mg/Kg that is within one foot of the surface will be removed and replaced with clean topsoil. | |||
| Publication Number | 07-09-078m | |||
| Author(s) | Nancy Lui | |||
| Contact | Jerome Cruz, (425) 649-7094 | |||
| Print Availability | ||||
| Number of pages | 2 | |||
| Keywords | clean up, smelter, soil | |||
| Location(s) |
| |||
| Related Web Content | Additional information | |||
Copyright © Washington State Department of Ecology. See http://www.ecy.wa.gov/copyright.html.