
| Title | Addendum to Quality Assurance Project Plan: Des Moines, Massey, and McSorley Creeks Copper and Zinc Water Quality Assessment | |||
| Month-Year Published | December 2010 | |||
| Online Availability |
378 kilobytes, requires version 4.0 or later of Adobe Acrobat Reader Software get Acrobat Reader
| |||
| Short Description |
This is an addendum to the study plan for the Des Moines, Massey, and McSorley Creeks copper and zinc water quality assessments. (Also see abstract below) | |||
| Publication Number | 08-03-119 Addendum 1 | |||
| Author(s) | Coots, R. | |||
| Print Availability | ||||
| Number of pages | 9 pp. | |||
| Keywords | 303(d), addendum, assessment, copper, creek, quality assurance project plan, water, water quality, zinc | |||
| Subject Waterbodies |
| |||
| Related Publications | Title | Relationship | ||
| Quality Assurance Project Plan: Des Moines, Massey, and McSorley Creeks Copper and Zinc Water Quality Assessment | parent publication | |||
| Abstract | Long Description |
This addendum describes changes to the stormwater sampling plan to meet requirements for a 303(d) evaluation. All sampling and laboratory procedures, quality control, and data quality objectives will adhere to protocols presented in the original QAPP. This addendum presents information on changes in sampling sites, the sample initiation trigger, analytical cost, and the project schedule. |
||
This page last updated August 17, 2011
Copyright © Washington State Department of Ecology. See http://www.ecy.wa.gov/copyright.html.