Publication Summary

Title

Addendum to Quality Assurance Project Plan: Des Moines, Massey, and McSorley Creeks Copper and Zinc Water Quality Assessment

Month-Year PublishedDecember 2010
Online Availability
View this publication in Acrobat PDF format
378 kilobytes,  requires version 4.0 or later of Adobe Acrobat Reader Software  get Acrobat Reader
Short Description

This is an addendum to the study plan for the Des Moines, Massey, and McSorley Creeks copper and zinc water quality assessments.

(Also see abstract below)
Publication Number08-03-119 Addendum 1
Author(s)Coots, R.
Print Availability
Request from the program.
Number of pages 9 pp.
Keywords 303(d), addendum, assessment, copper, creek, quality assurance project plan, water, water quality, zinc
Subject Waterbodies
Des Moines Creek
map of Washington state showing locations of subject waterbodies
Related Publications TitleRelationship    
Quality Assurance Project Plan: Des Moines, Massey, and McSorley Creeks Copper and Zinc Water Quality Assessmentparent publication
Abstract Long Description

This addendum describes changes to the stormwater sampling plan to meet requirements for a 303(d) evaluation. All sampling and laboratory procedures, quality control, and data quality objectives will adhere to protocols presented in the original QAPP. This addendum presents information on changes in sampling sites, the sample initiation trigger, analytical cost, and the project schedule.

This page last updated August 17, 2011