Publication Summary

Title

Evergreen/Alcoa Vancouver Aluminum Smelter Cleanup

Month-Year PublishedJune 2008
Online Availability
View this publication in Acrobat PDF format
179 kilobytes,  requires version 4.0 or later of Adobe Acrobat Reader Software  get Acrobat Reader
Short Description

Enforcement Order and SEPA Determination of Non-Significance Available for Public Review

The Washington State Department of Ecology (Ecology) is seeking public comment on a draft Enforcement Order and State Environmental Policy Act Determination of Non-Significance (SEPA DNS) for the Evergreen/Alcoa aluminum smelter site in Vancouver, Washington. The Enforcement Order directs Alcoa to clean up soil contamination and demolish petroleum tanks, piping and smelter ore unloading systems to prepare the dike and river bank for a sediment cleanup in the Columbia River beginning in November 2008.

Publication Number08-07-011
Author(s)Skillingstad, Paul
Print Availability
Request from the program.
Number of pages 2
Keywords aluminum, cleanup, Columbia River, enforcement, environmental, order, river, smelter, soil, State Environmental Policy Act

This page last updated June 5, 2008