
| Title | Agri-Tech/Yakima Steel Fabricators | |||
| Month-Year Published | October 2008 | |||
| Online Availability |
278 kilobytes, requires version 4.0 or later of Adobe Acrobat Reader Software get Acrobat Reader
Note: For more information see related web content below.
| |||
| Short Description |
The Washington State Department of Ecology has entered into an Agreed Order with Yakima Steel Fabricators, Inc., an operator on the Yakima Steel Fabricators property, to complete a Feasibility Study at the Agri-Tech/Yakima Steel Fabricators Site in Yakima, Washington. The facility was formerly known as Yakima Farmers Supply. Comments will be accepted October 27 through November 26, 2008. | |||
| Publication Number | 08-09-172 | |||
| Author(s) | Frosti Smith | |||
| Contact | Brian Deeken, (509) 454-7290 | |||
| Print Availability | ||||
| Number of pages | 2 | |||
| Keywords | agreed order, contamination, feasibility study | |||
| Location(s) |
| |||
Copyright © Washington State Department of Ecology. See http://www.ecy.wa.gov/copyright.html.