
| Title | Spokane River Metals Barker Road South Site - Comments Sought on Construction, SEPA, & Substantive Requirements Documents | |||
| Month-Year Published | August 2009 | |||
| Online Availability |
1412 kilobytes, requires version 4.0 or later of Adobe Acrobat Reader Software get Acrobat Reader
Note: For more information see related web content below.
| |||
| Short Description |
The Washington Department of Ecology proposes to build a fence around the Barker Road South site near the Centennial Trail. The fence will prevent access to contaminated soil at the bottom of the ravine along the river bank in this area. The site is located immediately south and east of the Barker Road Bridge in Spokane Valley, Washington. Documents available for review include Draft Construction Specifications & Design Drawings, SEPA Checklist and Determination of Non-Significance and Substantive Permit Requirements. Comment period is August 10 through September 9, 2009. | |||
| Publication Number | 09-09-027 | |||
| Author(s) | Carol Bergin | |||
| Contact | Dave George, (509) 329-3520 | |||
| Print Availability | ||||
| Number of pages | 3 | |||
| Keywords | cleanup, contaminated soil, heavy metals, public comment period | |||
| Location(s) |
| |||
| Related Web Content | Additional Information | |||
This page last updated August 6, 2009
Copyright © Washington State Department of Ecology. See http://www.ecy.wa.gov/copyright.html.