
| Title | Lower Duwamish Waterway RM 2.3-2.8 East (Seattle Boiler Works to Slip 4) - Source Control Action Plan | |||
| Month-Year Published | July 2009 | |||
| Online Availability |
2227 kilobytes, requires version 4.0 or later of Adobe Acrobat Reader Software get Acrobat Reader
Note: For more information see related web content below.
| |||
| Short Description |
The purpose of this Source Control Action Plan is to identify potential sources of contaminants to sediments associated with the Lower Duwamish Waterway River Mile 2.3-2.8 East source control area, and to identify the actions necessary to prevent recontamination of sediment after cleanup. This SCAP is based on a thorough review of information pertinent to sediment recontamination, as documented in the Summary of Existing Information and Identification of Data Gaps (SAIC 2008). | |||
| Publication Number | 09-09-083 | |||
| Author(s) | Sarah Good | |||
| Contact | Sarah Good, (425) 649-7257 | |||
| Print Availability | ||||
| Number of pages | 127 | |||
| Keywords | contaminated sediment, Lower Duwamish Waterway, Source Control Action Plan | |||
| Subject Waterbodies |
| |||
| Related Web Content | Additional Information | |||
This page last updated July 15, 2009
Copyright © Washington State Department of Ecology. See http://www.ecy.wa.gov/copyright.html.