
| Title | Quality Assurance Project Plan: Suspended Sediment and Turbidity Total Maximum Daily Load Effectiveness-Monitoring Project in the Upper Yakima River Basin April to October 2006 | |||
| Month-Year Published | April 2009 | |||
| Online Availability |
895 kilobytes, requires version 4.0 or later of Adobe Acrobat Reader Software get Acrobat Reader
| |||
| Short Description |
This project is a portion of the effectiveness monitoring phase of the Upper Yakima River Basin Suspended Sediment, Turbidity and Organochlorine Pesticide Total Maximum Daily Load (TMDL). The objective of this TMDL is to reduce sediment, turbidity and organochlorine pesticides in the upper Yakima River and its tributaries during the period from April through October. In this effectiveness monitoring project, only turbidity and suspended sediment levels will be evaluated; the organochlorine pesticide levels will be assessed in 2007. | |||
| Publication Number | 09-10-034 | |||
| Author(s) | Jane Creech | |||
| Print Availability |
Not available as a printed document
To save and view the document on your personal computer, right click on the link to the document and select "save target as."
| |||
| Number of pages | 43 | |||
| Keywords | monitoring, organochlorine, pesticide, quality assurance project plan, suspended sediment, Total Maximum Daily Load | |||
| Subject Waterbodies |
| |||
| Related Web Content | TMDL Activity - WRIA 39 | |||
This page last updated September 7, 2011
Copyright © Washington State Department of Ecology. See http://www.ecy.wa.gov/copyright.html.