Publication Summary

Title

Errata: Pend Oreille River Temperature Total Maximum Daily Load: Water Quality Improvement Report

Month-Year PublishedOctober 2011
Online Availability
View this publication in Acrobat PDF format
136 kilobytes,  requires version 4.0 or later of Adobe Acrobat Reader Software  get Acrobat Reader
Short Description

On April 6, 2011, the Washington State Department of Ecology sent the Pend Oreille River temperature Total Maximum Daily Load (TMDL) to the Environmental Protection Agency (EPA) for approval. During EPA′s review and prior to its final approval, affected parties Seattle City Light (SCL) and the Pend Oreille Public Utility District No. 1 (PUD) initiated Ecology′s dispute resolution process. The dispute resolution process is a mechanism by which a local entity or citizen can request reconsideration of final TMDLs developed by Ecology, and/or bring a dispute of a procedural step in the TMDL development process. Among the outcomes of the dispute resolution process Ted Sturdevant, the Director of Ecology, decided to amend the TMDL with the following minor changes:

  • The TMDL needs to clarify that the compliance path for the Pend Oreille Public Utility District (PUD) is the compliance schedule outlined in the Water Quality Standards [WAC 173-201A-510(5)]. This is the same path as that used for all dams going through Federal Energy Regulatory Commission (FERC) re-licensing.
  • The temperature reduction target in the Boundary Dam forebay needs to reflect the temperature signal from the PUD′s Box Canyon Dam. The required temperature reduction in the Boundary forebay should be 0.76oC, not the 0.88oC listed in the TMDL. However, SCL′s allocation remains unchanged at natural conditions + 0.12oC. The distinction is that the PUD′s efforts to implement the TMDL will result in reduced temperatures flowing into Boundary Dam′s forebay. Therefore, the cumulative temperature reduction from both the PUD and SCL is a temperature reduction of 0.76oC in the Boundary Dam forebay.
  • Ecology intends to make these and possibly other minor changes in the online version of the TMDL (Ecology publication number 10-10-065) following review and comment by affected parties.

    Publication Number10-10-065errata1
    Author(s)Moore, David
    ContactMoore, David, (509) 329-3514
    Print Availability
    Request from the program.
    The mission of the Department of Ecology is to protect, preserve and enhance Washington′s environment. To help us meet that goal, please consider the environment before you print or order copies.
    Number of pages 6
    Keywords temperature, Total Maximum Daily Load, water quality improvement, water quality improvement report
    Subject Waterbodies
    WRIA 62 - Pend Oreille
    map of Washington state showing locations of subject waterbodies
    Related Web ContentWater Quality Improvement Projects: Pend Oreille River Area
    Related Publications TitleRelationship    
    Pend Oreille River Temperature Total Maximum Daily Load: Water Quality Improvement Reportprimary publication

    This page last updated October 21, 2011