
| Title | College Place STP Class II Inspection. | |||
| Month-Year Published | May 1988 | |||
| Online Availability |
724 kilobytes, requires version 4.0 or later of Adobe Acrobat Reader Software get Acrobat Reader
| |||
| Short Description |
A Class II inspection was conducted at the College Place Sewage Treatment Plant (STP) on June 23-25, 1987. The plant is a trickling filter facility followed by a lagoon system. Overall plant efficiency was acceptable during the inspection, although the mechanical portion of the plant was functioning less efficiently than expected. The cause of the reduced efficiency was not found, but soluble BOD5 testing is recommended to help discern if treatability or plant operation is the problem source. Partial nitrification at the plant lead to the recommendation that CBOD5 tests be allowed for NPDES permit compliance testing. | |||
| Publication Number | 88-e05 | |||
| Author(s) | Heffner, M. | |||
| Print Availability |
Not maintained in stock. Copy must be made from archive version.
| |||
| Number of pages | 20 pp. | |||
| Keywords | Inspection, lead, sewage, sewage treatment, site investigation, treatment | |||
| Subject Waterbodies |
| |||
Copyright © Washington State Department of Ecology. See http://www.ecy.wa.gov/copyright.html.