Publication Summary

Title

Colville Wastewater Treatment Plant Class II Inspection September 22-23, 1987

Month-Year PublishedAugust 1988
Online Availability
View this publication in Acrobat PDF format
1176 kilobytes,  requires version 4.0 or later of Adobe Acrobat Reader Software  get Acrobat Reader
Short Description

A Class II inspection was conducted at the Colville Wastewater Treatment Plant on September 22 and 23, 1987. The WTP is a three-cell lagoon system discharging into the Colville River. The plant was meeting the BOD5 and TSS limits set forth in Docket No. DE-77-281 which relaxes the NPDES permit limits (#WA-002261-6). Metals concentrations in the plant discharge were below toxicity concentration criteria. Plans to remove sludge from the first lagoon cell should be developed and executed in the near future. Improved flow measurement is also recommended.

Publication Number88-e10
Author(s)Heffner, M.
Print Availability
Request from the program.
Not maintained in stock. Copy must be made from archive version.
Number of pages 29 pp.
Keywords BOD5, colville river, flow, metals, NPDES, river, site investigation, toxicity, TSS, wastewater treatment plant
Subject Waterbodies
Colville River
map of Washington state showing locations of subject waterbodies

This page last updated May 13, 2009