
| Title | Bellingham Post Point Pollution Control Plant Class II Inspection | |||
| Month-Year Published | February 1988 | |||
| Online Availability |
1971 kilobytes, requires version 4.0 or later of Adobe Acrobat Reader Software get Acrobat Reader
| |||
| Short Description |
A Class II inspection was performed at the city of Bellingham′s Post Point Pollution Control Plant on August 25 and 26, 1987. The plant was running well, violated no NPDES permit parameters, and exceeded its designed removal efficiencies. Laboratory procedures and agreement of split sample results were excellent. Three effluent bioassays (rainbow trout, oyster larvae, and Microtox) indicated varying degrees of toxicity. Recommendations were made for influent sampler placement, further effluent bioassay testing, and minor laboratory adjustments. | |||
| Publication Number | 88-e32 | |||
| Author(s) | Reif, D. | |||
| Print Availability |
Not maintained in stock. Copy must be made from archive version.
| |||
| Number of pages | 55 pp. | |||
| Keywords | Inspection, laboratory, pollution , pollution control, recommendations, site investigation, toxic | |||
| Subject Waterbodies |
| |||
This page last updated May 13, 2009
Copyright © Washington State Department of Ecology. See http://www.ecy.wa.gov/copyright.html.