Publication Summary

Title

Enumclaw Class II Inspection Report, October 4-5, 1988.

Month-Year PublishedAugust 1989
Online Availability
View this publication in Acrobat PDF format
1388 kilobytes,  requires version 4.0 or later of Adobe Acrobat Reader Software  get Acrobat Reader
Short Description

A Class II Inspection was conducted at the Enumclaw Sewage Treatment Plant (STP) on October 4-5, 1988. A limited receiving water study in the White River near the outfall was included as part of the inspection. Samples were also collected at the Nalley pickle facility. The Nalley discharge had fairly high BOD5 and TSS concentrations, but loads to the Enumclaw STP were greatly reduced from those occurring during the 1986 Class II inspection. The Enumclaw STP was operating well with discharge characteristics within NPDES permit limits. The discharge hugged the right bank of the receiving water causing some concern.

Publication Number89-e16
Author(s)Heffner, M.
Print Availability
Request from the program.
Not maintained in stock. Copy must be made from archive version.
Number of pages 39 pp.
Keywords Inspection, report , right, river, samples, sewage, sewage treatment, site investigation, study, treatment, water, White River
Subject Waterbodies
Boise Creek
map of Washington state showing locations of subject waterbodies

This page last updated August 17, 2011