Publication Summary

Title

Snoqualmie Pass Wastewater Treatment Plant February 9-10, 1988 and March 2, 1988 Class II Inspection Report

Month-Year PublishedMarch 1989
Online Availability
View this publication in Acrobat PDF format
1387 kilobytes,  requires version 4.0 or later of Adobe Acrobat Reader Software  get Acrobat Reader
Short Description

A Class II inspection was conducted at the Snoqualmie Pass Sewer District (SPSD) Wastewater Treatment Plant on February 9-10, 1988 and March 2, 1988. The facility consists of a two-cell aerated lagoon system followed by spray irrigation of the treated effluent on forest land. The permit specifies ground water as the receiving water. Survey results indicated that not all discharge was to the ground water. The facility is subject to Ecology Advanced Waste Treatment Guidelines because drainage is tributary to Keechelus Lake. A monitoring program allowing SPSD treatment to be compared to Ecology Advanced Waste Treatment Guidelines is recommended.

Publication Number89-e19
Author(s)Heffner, M.
Print Availability
Request from the program.
Not maintained in stock. Copy must be made from archive version.
Number of pages 35 pp.
Keywords effluent, ground water, guidelines, irrigation, lake, receiving water, site investigation, survey results, wastewater treatment plant, water
Subject Waterbodies
Keechelus Lake
map of Washington state showing locations of subject waterbodies

This page last updated May 14, 2009