
| Title | Wapato Wastewater Treatment Plant Class II Inspection. | |||
| Month-Year Published | September 1989 | |||
| Online Availability |
799 kilobytes, requires version 4.0 or later of Adobe Acrobat Reader Software get Acrobat Reader
| |||
| Short Description |
A Class II inspection was conducted at the Wapato Wastewater Treatment Plant (WTP) on October 5-7, 1987. The effluent was within permit limitations during the inspection. Laboratory samples did not correlate well with Ecology′s. Composite samplers need to be installed to obtain a more representative influent sample/load and a consistent sampling methodology. The treatment plant exceeded the "85% of design" criteria for influent loading. Therefore, a plan and schedule for continuing to maintain adequate treatment capacity should be submitted to Ecology. | |||
| Publication Number | 89-e42 | |||
| Author(s) | Ruiz, C.E. and D. Reif | |||
| Print Availability |
Not maintained in stock. Copy must be made from archive version.
| |||
| Number of pages | 20 pp. | |||
| Keywords | Inspection, laboratory, site investigation, treatment, waste, wastewater, wastewater treatment plant | |||
| Subject Waterbodies |
| |||
Copyright © Washington State Department of Ecology. See http://www.ecy.wa.gov/copyright.html.