Publication Summary

Title

Treetop, Wenatchee Wastewater Treatment Plant, Class II Inspection.

Month-Year PublishedJune 1989
Online Availability
View this publication in Acrobat PDF format
516 kilobytes,  requires version 4.0 or later of Adobe Acrobat Reader Software  get Acrobat Reader
Short Description

A Class II inspection was conducted at the Treetop, Wenatchee, wastewater treatment plant on March 15-16, 1988. The plant was in compliance with all permitted parameters at the time of the inspection.

(Also see abstract below)
Publication Number89-e45
Author(s)Reif, D.
Print Availability
Request from the program.
Not maintained in stock. Copy must be made from archive version.
Number of pages 11 pp.
Keywords Inspection, site investigation, treatment, waste, wastewater, wastewater treatment plant
Subject Waterbodies
Columbia River
map of Washington state showing locations of subject waterbodies
Abstract Long Description

A Class II inspection was conducted at the Treetop, Wenatchee, wastewater treatment plant on March 15-16, 1988. The plant was in compliance with all permitted parameters at the time of the inspection. Flows and loadings were well below designed limits, and effluent loadings also far below NPDES permit limits. Intermediate process sampling procedures, as required in the permit, were found to be helpful in understanding process dynamics. Some of the sample splits did not compare well. Based on this, and the findings of the laboratory procedures survey, several recommendations are made, including further lab sample comparisons. Other recommendations include a review of Treetop′s preventive maintenance program and spare parts inventory.