
| Title | City of Sumas Class II Inspection, September 23-25, 1991 | |||
| Month-Year Published | October 1992 | |||
| Online Availability |
1067 kilobytes, requires version 4.0 or later of Adobe Acrobat Reader Software get Acrobat Reader
| |||
| Short Description |
A Class II Inspection was conducted at the town of Sumas Wastewater Treatment Plant on September 23-25, 1991. The inspection found a plant which was performing quite well, achieving 98 percent removal of BOD5 and TSS, as well as nitrification and denitrification. Copper, lead, and zinc were detected, but at concentrations below water quality standards. No toxicity was indicated by bioassays run on effluent. The present sampling procedure involving 8-hour hand composites is not always producing representative samples, and should be replaced. | |||
| Publication Number | 92-e29 | |||
| Author(s) | Glenn, N. | |||
| Print Availability |
Not maintained in stock. Copy must be made from archive version.
| |||
| Number of pages | 17 pp. | |||
| Keywords | bioassay, BOD5, copper, effluent, lead, site investigation, toxicity, TSS, wastewater treatment plant, water, water quality, zinc | |||
| Subject Waterbodies |
| |||
This page last updated May 11, 2009
Copyright © Washington State Department of Ecology. See http://www.ecy.wa.gov/copyright.html.