
| Title | Longview Fibre Company Class II Inspection November 2-3, 1993 | |||
| Month-Year Published | November 1993 | |||
| Online Availability |
1651 kilobytes, requires version 4.0 or later of Adobe Acrobat Reader Software get Acrobat Reader
| |||
| Short Description |
A Class II Inspection was conducted in November 1993 at the Longview Fibre Company, Pulp and Paper Mill. The facility discharges combined industrial and sanitary wastewater to the Columbia River. The inspection data found Longview Fibre discharging a good quality effluent for the conventional parameters analyzed. Effluent concentrations were within the NPDES permit limitations. Effluent priority pollutant concentrations for mercury, copper and lead were at or near the chronic State/USEPA Water Quality Criteria. Bioassay testing documented limited toxicity to two of the test organisms. | |||
| Publication Number | 94-160 | |||
| Author(s) | Stasch, P. | |||
| Print Availability | ||||
| Number of pages | 39 pp. | |||
| Keywords | bioassay, Columbia River, copper, dust, effluent, Inspection, lead, mercury, NPDES, priority pollutant, pulp, quality, river, site investigation, toxicity, waste, water, water quality | |||
| Subject Waterbodies |
| |||
This page last updated August 17, 2011
Copyright © Washington State Department of Ecology. See http://www.ecy.wa.gov/copyright.html.