
| Title | City of Tekoa. Wastewater Treatment Plan Class II Inspection, August 31 - September 1, 1993 | |||
| Month-Year Published | March 1994 | |||
| Online Availability |
1430 kilobytes, requires version 4.0 or later of Adobe Acrobat Reader Software get Acrobat Reader
| |||
| Short Description |
A Class II Inspection was conducted on August 31 and September 1, 1993, at the city of Tekoa Wastewater Treatment Plant in Whitman County, Washington. The Tekoa facility is an activated sludge plant which discharges treated and disinfected effluent into upper Hangman Creek. The inspection data found the Tekoa facility was producing a high quality effluent. Effluent concentrations were all within the NPDES permit limitations. Effluent priority pollutant metal concentrations were all less than the EPA Water Quality Criteria for fresh waters. | |||
| Publication Number | 94-33 | |||
| Author(s) | Stasch, P. | |||
| Print Availability |
Not maintained in stock. Copy must be made from archive version. Request will be referred to the source program.
| |||
| Number of pages | 18 pp. + app. (30 total) | |||
| Keywords | county, creek, effluent, NPDES, priority pollutant, quality, site investigation, waste, wastewater treatment plant, water, water quality | |||
| Subject Waterbodies |
| |||
This page last updated August 17, 2011
Copyright © Washington State Department of Ecology. See http://www.ecy.wa.gov/copyright.html.