
| Title | Total Maximum Daily Loads (TMDL) Workload Model -- Program Definition and Cost | |
| Month-Year Published | July 1998 | |
| Online Availability |
149 kilobytes, requires version 4.0 or later of Adobe Acrobat Reader Software get Acrobat Reader
| |
| Short Description |
A definition and cost estimate of the total daily maximum load program in Washington. | |
| Publication Number | 98-026 | |
| Print Availability | ||
| Number of pages | 25 | |
| Keywords | model, Total Maximum Daily Load, Water Quality, watershed | |
This page last updated August 11, 2011
Copyright © Washington State Department of Ecology. See http://www.ecy.wa.gov/copyright.html.