Publication Summary

Title

Changing or Transferring an Existing Water Right

Month-Year PublishedJune 1998
Revised onApril 2008
Online Availability
View this publication in Acrobat PDF format
258 kilobytes,  requires version 4.0 or later of Adobe Acrobat Reader Software  get Acrobat Reader
Short Description

This report describes the change application process, what can and cannot be changed and information they will need to submit with their application. With much of our water already allocated in Washington State, new water rights are increasingly difficult to obtain. As a result, more and more people are choosing to make changes to existing water rights. In many areas of the state, water is already claimed or over appropriated and no new water rights are being granted. The Washington Department of Ecology may consider changes to the following elements of an existing water right permit, certificate, or claim:

(Also see abstract below)
Publication Number98-1802-WR
Author(s)Editor/Contact: Geller, Lynne-(360) 407-6450 -- (Original Author: Smith, P.)
Print Availability
Request from the program.
Number of pages 4
Keywords grant, land development, land owner, property owner, right, water, water right, water right claim, Water Rights
Related Web ContentWater Resources Program
Related Publications TitleRelationship    
2003 Report to the Legislature: Water Right Applications Processingsupporting publication
Application for Change/Transfer of Water Rightrelated form
Abstract Long Description

This report describes the change application process, what can and cannot be changed and information they will need to submit with their application. With much of our water already allocated in Washington State, new water rights are increasingly difficult to obtain. As a result, more and more people are choosing to make changes to existing water rights. In many areas of the state, water is already claimed or over appropriated and no new water rights are being granted. The Washington Department of Ecology may consider changes to the following elements of an existing water right permit, certificate, or claim:

  • Place of use;
  • Point of diversion or withdrawal;
  • Additional point(s) of diversion or withdrawal; or
  • Purpose of use.


  • This page last updated June 26, 2008