| Title (link to summary) |
Number |
Date (released or updated) |
| Assessment of Surface Water and Groundwater Interchange within the Muck Creek Watershed, Pierce County | 01-03-037 | December 2001 |
| Salmon Recovery Index Watershed Monitoring Program: Water Quality Index Report, October 2000 - September 2001 | 01-03-046 | December 2001 |
| Quality Assurance Project Plan: Stillaguamish River Temperature Total Maximum Daily Load | 01-03-066 | December 2001 |
| Addendum to Quality Assurance Project Plan: Monitoring Program to Verify 303(d) Metals Listings for Selected Rivers and Creeks: Addendum, Arsenic Sampling of Selected Washington Rivers | 01-03-070 | December 2001 |
| Ecology Responses to Public Comments Received on the Draft PBT Strategy | 01-03-035 | December 2001 |
| Padden Creek Pesticide Monitoring Program, 2001 Progress Report | 01-03-045 | December 2001 |
| Relationship Between the Upper Dungeness River and the Bedrock Aquifer, Clallam County | 01-03-027 | December 2001 |
| Reassessment of Toxicity of Lake Roosevelt Sediments | 01-03-043 | December 2001 |
| River and Stream Ambient Monitoring Report for Water Year 2000 | 01-03-042 | December 2001 |
| Chehalis Best Management Practices Evaluation Project, 1995-2000 Temperature Monitoring Data | 01-03-041 | December 2001 |
| Quality Assurance Project Plan: Ferndale WWTP Outfall Sediments | 01-03-067 | November 2001 |
| Dungeness River/Matriotti Creek Fecal Coliform Bacteria Total Maximum Daily Load Study Streamflow Summary | 01-03-039 | November 2001 |
| Union River Fecal Coliform Total Maximum Daily Load Study | 01-03-038 | November 2001 |
| Stream Sampling Protocols for the Environmental Monitoring and Trends Section | 01-03-036 | November 2001 |
| Quality Assurance Project Plan: Groundwater/Surface Water Interactions In the Sammamish River: a Preliminary Analysis. | 01-03-068 | October 2001 |
| Condition of Freshwaters in Washington State for the Year 2000 | 01-03-025 | October 2001 |
| Condition of Freshwaters in Washington State: Technical Appendix | 01-03-026 | October 2001 |
| Zinc, Copper, and Lead Concentrations in Quilceda and Allen Creeks: Results of Cooperative Monitoring by Snohomish County and the Washington State Department of Ecology | 01-03-031 | October 2001 |
| Lakewood Plaza Cleaners, January and August 2001 Groundwater Monitoring Sampling Results | 01-03-032 | September 2001 |
| Analysis and Occurrence of Polybrominated Diphenyl Ethers in Washington State Freshwater Fish. Article in Archives of Environmental Contamination and Toxicology 41, 339-344 (2001) | 01-03-033 | September 2001 |
| Aquatic Plants Technical Assistance Program 2000 Activity Report | 01-03-034 | September 2001 |
| Investigation into Recurring Toxicity of the Chinet Company Columbia River Intake | 01-03-030 | September 2001 |
| Benthic Macroinvertebrate Biological Monitoring Protocols for Rivers and Streams: 2001 Revision | 01-03-028 | September 2001 |
| Quality Assurance Project Plan: Sampling to Verify 303(d) Listings for Chemical Contaminants in Shellfish Tissue from Dyes Inlet and Port Washington Narrows | 01-03-069 | August 2001 |
| Quality Assurance Project Plan: Willapa River Temperature Total Maximum Daily Load | 01-03-063 | August 2001 |
| Water Quality Assessments of Selected Lakes within Washington State: 1999 | 01-03-009 | July 2001 |
| Chemical Analysis and Toxicity Testing of Spokane River Sediments Collected in October 2000 | 01-03-019 | July 2001 |
| Spokane River/Aquifer Interaction Project Results, May - November 1999 | 01-03-024 | July 2001 |
| Aquatic Plant Sampling Protocols | 01-03-017 | June 2001 |
| American Crossarm and Conduit Monitoring Results, November 2000 and April 2001 | 01-03-022 | June 2001 |
| Contaminants Associated with Settling Particulate Matter and Bottom Sediments at Two Marinas in Thea Foss Waterway | 01-03-023 | June 2001 |
| Quality Assurance Project Plan: Monitoring Program to Verify 303(d) Metals Listings for Selected Rivers and Creeks | 01-03-071 | June 2001 |
| North Creek Watershed: Total Maximum Daily Load Evaluation for Fecal Coliform Bacteria | 01-03-020 | June 2001 |
| Re-Evaluation of Copper Impact from Wilkeson Wastewater Treatment Plant on Wilkeson Creek. | 01-03-021 | May 2001 |
| Quality Assurance Project Plan: PCBs in Sediments from Selected Sites in Puget Sound | 01-03-072 | May 2001 |
| Final Statewide 303(d) Workload Assessment | 01-03-018 | May 2001 |
| Quality Assurance Project Plan: Reassessment of Toxicity of Lake Roosevelt Sediments | 01-03-073 | May 2001 |
| An Ecological Hazard Assessment for PCBs in the Spokane River | 01-03-015 | April 2001 |
| Quality Assurance Project Plan: Stillaguamish River Basin and Port Susan Total Maximum Daily Load Evaluation Update | 01-03-065 | April 2001 |
| Quality Assurance Project Plan: Characterization of the Groundwater Discharge to Moses Lake, Washington | 01-03-074 | April 2001 |
| Quality Assurance Project Plan: Moses Lake Phosphorus TMDL Study | 01-03-075 | April 2001 |
| Quality Assurance Project Plan: Freshwater Field Protocol Comparability | 01-03-200 | April 2001 |
| Spokane River PCB and Source Survey, August 2000 | 01-03-016 | April 2001 |
| Skokomish River Basin Fecal Coliform Bacteria Total Maximum Daily Load Study | 01-03-014 | April 2001 |
| Mercury Concentrations in Edible Muscle of Lake Whatcom Fish | 01-03-012 | April 2001 |
| River and Stream Ambient Monitoring Report for Water Year 1999 | 01-03-013 | April 2001 |
| Carbaryl Concentrations in Willapa Bay and Recommendations for Water Quality Guidelines | 01-03-005 | March 2001 |
| Quality Assurance Project Plan: Padden Creek Pesticide Monitoring Project | 01-03-076 | March 2001 |
| Flow Summary at Three Seasonal Gaging Stations on the Little Klickitat River | 01-03-006 | March 2001 |
| Concentrations of Selected Chemicals in Sediments from Harbors in the San Juan Islands | 01-03-007 | March 2001 |
| Restover Truck Stop Groundwater Monitoring, Results of December 2000 Sampling | 01-03-011 | March 2001 |
| Survey of Typical Soils Arsenic Concentrations in Residential Areas of the City of University Place | 01-03-008 | March 2001 |
| Guidelines for Preparing Quality Assurance Project Plans for Environmental Studies | 01-03-003 | February 2001 |
| Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load Phase II Evaluation | 01-03-064 | January 2001 |
| USBR Columbia River Pump Exchange Project: Potential Water Quality Impacts on the Lower Yakima River | 01-03-000 | January 2001 |
| The Use of Sediment Cores to Track Persistent Pollutants in Washington State: A Review | 01-03-001 | January 2001 |
| Dungeness River and Matriotti Creek Total Maximum Daily Load Study: Preliminary Data Results for November 1999 through October 2000 | 01-03-002 | January 2001 |