| Continuous Temperature Sampling Protocols for the Environmental Monitoring and Trends Section | 03-03-052 | December 2003 |
| Oceanographic Changes in Puget Sound and the Strait of Juan de Fuca during the 2000-01 Drought. Article in Canadian Water Resources Journal, Vol. 28, No. 4, p. 715-728 (2003). | 03-03-053 | December 2003 |
| Lakewood Plaza Cleaners, February and September 2003 Groundwater Monitoring Results | 03-03-050 | December 2003 |
| Quality Assurance Project Plan: Verification of 303(d) Listed Sites in Northwest, Central, and Eastern Regions of Washington State | 03-03-112 | December 2003 |
| Quality Assurance Project Plan: Stormwater Quality Survey of Western Washington Log Yards | 03-03-113 | December 2003 |
| Quality Assurance Project Plan: Stormwater Quality Survey of Western Washington Construction Sites | 03-03-111 | November 2003 |
| Chemical Contamination, Acute Toxicity in Laboratory Tests, and Benthic Impacts in Sediments of Puget Sound: A summary of results of the joint 1997-1999 Ecology/NOAA survey | 03-03-049 | November 2003 |
| Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon Status Report, December 2002 and May 2003 | 03-03-046 | October 2003 |
| Quality Assurance Project Plan: Little Squalicum Creek Biological Toxicity Assessment | 03-03-110 | October 2003 |
| Padden Creek Pesticide Study: Final Report | 03-03-048 | October 2003 |
| Quality Assurance Project Plan: Total Maximum Daily Load Study for PCBs in the Spokane River | 03-03-107 | October 2003 |
| Quality Assurance Project Plan: Monitoring 303(d) Listed Pesticides, PCBs, and PAHs in the Lower Columbia River Drainage Using a Semipermeable Membrane Device | 03-03-108 | October 2003 |
| Quality Assurance Project Plan: Groundwater Assessment Program Pilot Study, Phase 1 | 03-03-109 | October 2003 |
| Aquatic Plants Technical Assistance Program, 2002 Activity Report | 03-03-033 | September 2003 |
| Data Summary: Spokane River and Lake Spokane (Long Lake) Pollutant Loading Assessment for Protecting Dissolved Oxygen | 03-03-023 | August 2003 |
| Quality Assurance Project Plan: Lake Bacteria Sampling Project | 03-03-201 | August 2003 |
| Total Maximum Daily Load for Lower Snake River Total Dissolved Gas | 03-03-020 | August 2003 |
| Quality Assurance Project Plan: Wenatchee River Temperature, Dissolved Oxygen, pH, and Fecal Coliform Total Maximum Daily Load, Year 2 Technical Study | 03-03-106 | August 2003 |
| Totten and Eld Inlets Clean Water Projects, Final Report | 03-03-010 | July 2003 |
| Data Appendixes B, C, and D: Totten and Eld Inlets Clean Water Projects, Final Report | 03-03-011 | July 2003 |
| Groundwater Quality in the Central Ahtanum Valley, Yakima County, March 2001 - December 2002 | 03-03-040 | July 2003 |
| Quality Assurance Project Plan: TMDL Effectiveness Monitoring and Water Quality Evaluation in the Lower Yakima River | 04-03-203 | July 2003 |
| TMDL Technical Assessment of DDT and PCBs in the Lower Okanogan River Basin | 03-03-013 | July 2003 |
| Shelton Laundry & Cleaners, July 2002 through April 2003 Groundwater Monitoring Results | 03-03-038 | July 2003 |
| Symposium Article: Total Maximum Daily Load Effectiveness Monitoring Strategy for Washington State | 03-03-039 | July 2003 |
| Quality Assurance Project Plan: Total Maximum Daily Load Study for DDT and PCBs in Lake Chelan | 03-03-105 | July 2003 |
| Multi-Metric Index Development for Biological Monitoring in Washington State Streams | 03-03-035 | July 2003 |
| Condition of Fresh Waters in Washington State for the Year 2002 | 03-03-030 | June 2003 |
| Condition of Fresh Waters in Washington State for the Year 2002: Technical Appendix | 03-03-031 | June 2003 |
| River and Stream Ambient Monitoring Report for Water Year 2002 | 03-03-032 | June 2003 |
| Quality Assurance Project Plan: 2003 BEACH Pilot Project | 03-03-202 | June 2003 |
| Ecology/Health Responses to Public Comments Received on the Draft Mercury Chemical Action Plan | 03-03-029 | June 2003 |
| Pesticide Reduction Evaluation for Cranberry Bog Drainage in the Grayland Area | 03-03-034 | June 2003 |
| Mercury in Edible Fish Tissue and Sediments from Selected Lakes and Rivers of Washington State | 03-03-026 | June 2003 |
| Focus on Mercury in Fish: Study finds elevated levels in Washington fish | 03-03-036 | June 2003 |
| Frequently Asked Questions about Mercury in Bass | 03-03-037 | June 2003 |
| Effectiveness Monitoring for Fecal Coliform Total Maximum Daily Loads in Pipers Creek | 03-03-027 | June 2003 |
| Quality Assurance Monitoring Plan: Stream Ambient Water Quality Monitoring, Revision of 1995 Version | 03-03-200 | June 2003 |
| South Prairie Creek Bacteria and Temperature Total Maximum Daily Load Study | 03-03-021 | June 2003 |
| Strategic Recommendations for Groundwater Assessment Efforts of the Environmental Assessment Program | 03-03-009 | May 2003 |
| Quality Assurance Project Plan: Washington State Surface Water Monitoring Program for Pesticides in Salmonid Habitat for Two Index Watersheds: A Study for the Washington State Department of Agriculture by the Washington State Department of Ecology | 03-03-104 | May 2003 |
| Investigation of Background Inorganic and Organic Arsenic in Four Washington Lakes | 03-03-024 | May 2003 |
| Don't Mess with Mercury | 03-03-018 | April 2003 |
| Flow Summary for Gaging Stations on the Stillaguamish River and Selected Tributaries, May through October 2001 | 03-03-019 | April 2003 |
| Quality Assurance Project Plan: Total Maximum Daily Load Study for DDT Contamination and Transport in the Lower Mission Creek Basin, Chelan County, Washington | 03-03-103 | April 2003 |
| Verification of 1998 303(d) PCB Listing, Inner Budd Inlet | 03-03-016 | April 2003 |
| Groundwater Quality in the Agnew and Carlsborg area, Clallam County, December 2000 - September 2002 | 03-03-017 | April 2003 |
| Groundwater/Surface Water Interactions in the Upper Sammamish River: A Preliminary Analysis | 03-03-015 | March 2003 |
| Quality Assurance Project Plan: Spokane River Total Dissolved Gas Total Maximum Daily Load Evaluation | 03-03-102 | March 2003 |
| Washington State Toxics Monitoring Program: Toxic Contaminants in Fish Tissue and Surface Water in Freshwater Environments, 2001 | 03-03-012 | March 2003 |
| Sediment Toxicity Near Gas Works Park, Lake Union, Seattle | 03-03-014 | March 2003 |
| Quality Assurance Project Plan: Addendum to Operation and Maintenance Manual of the Treatment Lagoon, Palermo Wellfield Superfund Site | 03-03-101 | March 2003 |
| Moses Lake Total Maximum Daily Load Groundwater Study | 03-03-005 | February 2003 |
| Norfolk Combined Sewer Overflow (Duwamish River) Sediment Cap Recontamination, Phase I Investigation | 03-03-004 | February 2003 |
| Washington State Mercury Chemical Action Plan | 03-03-001 | February 2003 |
| Quality Assurance Project Plan: Henderson and Nisqually TMDL Study | 03-03-100 | February 2003 |
| Total Mercury Concentrations among Fish and Crayfish Inhabiting Different Trophic Levels in Lake Whatcom, Washington. Article in Journal of Freshwater Ecology, Volume 71, Number 4, p. 621-633, December 2002. | 03-03-008 | February 2003 |
| Lakewood Plaza Cleaners, February and August 2002 Groundwater Monitoring Sampling Results | 03-03-007 | February 2003 |
| Effectiveness Monitoring for Dioxin Total Maximum Daily Loads in Western Washington | 03-03-002 | January 2003 |