| Title (link to summary) |
Number |
Date (released or updated) |
| Quality Assurance Project Plan: Using Sediment Profile Imaging (SPI) to Evaluate Sediment Quality at Two Puget Sound Cleanup Sites: Part I - Lower Duwamish Waterway | 06-03-116 | December 2006 |
| Quality Assurance Project Plan: Using Sediment Profile Imaging (SPI) to Evaluate Sediment Quality at Two Puget Sound Cleanup Sites: Part II: Port Gamble Bay | 06-03-117 | December 2006 |
| Quality Assurance Project Plan: Feasibility of using Sediment Profile Imaging Technology to Evaluate Sediment Quality and Impacts to Benthic Communities found at two Contaminated Sediment Cleanup Sites in the Puget Sound. | 06-03-119 | December 2006 |
| Replicate Precision for 12 TMDL Studies and Recommendations for Precision Measurement Quality Objectives for Water Quality Parameters | 06-03-044 | December 2006 |
| Status and Trends Monitoring for Watershed Health and Salmon Recovery: Quality Assurance Monitoring Plan | 06-03-203 | December 2006 |
| Chemical Characterization of Stormwater Runoff from Three Puget Sound Boatyards | 06-03-041 | December 2006 |
| Effectiveness of Timber Harvest Practices for Controlling Sediment Related Water Quality Impacts. Article in Journal of the American Water Resources Association, October 2006, p. 1307-1327. | 06-03-046 | December 2006 |
| Quality Assurance Project Plan: Puyallup River Watershed Fecal Coliform Bacteria Total Maximum Daily Load Study | 06-03-115 | December 2006 |
| Quality Assurance Project Plan: Similkameen River and Palmer Lake Investigation of Arsenic in Fish Tissue | 06-03-118 | December 2006 |
| Washington State Water Quality Conditions in 2005, based on Data from the Freshwater Monitoring Unit | 06-03-030 | November 2006 |
| Washington State Water Quality Conditions in 2005, based on Data from the Freshwater Monitoring Unit: Technical Appendix | 06-03-031 | November 2006 |
| An Evaluation of a Piezometer-Based Constant Head Injection Test (CHIT) for use in Groundwater/Surface Water Interaction Studies | 06-03-042 | November 2006 |
| Pullman Stormwater Pilot Study for Pesticides, PCBs, and Fecal Coliform Bacteria, 2005-2006 | 06-03-034 | October 2006 |
| PCB Monitoring at Walla Walla Wastewater Treatment Plants | 06-03-114 | October 2006 |
| Addendum to Quality Assurance Project Plan: Pend Oreille River Temperature TMDL | 04-03-109ADD | October 2006 |
| Addendum to Quality Assurance Project Plan: Montesano Groundwater Investigation of Leaking Underground Storage Tank Sites | 04-03-114ADD | October 2006 |
| Sampling and Analysis Plan and Quality Assurance Project Plan: Green River and Newaukum Creek Temperature and Dissolved Oxygen Study | 06-03-110 | October 2006 |
| Quality Assurance Project Plan: Depositional History of Mercury in Selected Washington Lakes Determined from Sediment Cores. | 06-03-113 | October 2006 |
| Surface Water Monitoring Program for Pesticides in Salmonid-Bearing Streams, 2003-2005: A Cooperative Study by the Washington State Departments of Ecology and Agriculture | 06-03-036 | October 2006 |
| Sampling and Analysis Plan and Quality Assurance Project Plan: Bear/Evans Watershed Temperature and Dissolved Oxygen Total Maximum Daily Load Study | 06-03-107 | September 2006 |
| Quality Assurance Project Plan: South Fork Palouse River Dissolved Oxygen and pH Total Maximum Daily Load Study | 06-03-112 | September 2006 |
| Appendix A: A Summary of Landuse, Landcover, Stream Flow, and Water Quality Data for Watersheds of Streams, Piped Catchments, Open Watersheds, and Nearshore Areas Draining into Sinclair and Dyes Inlets | 05-03-042appA | September 2006 |
| Appendix B: Raw Data | 05-03-042appB | September 2006 |
| Appendix C: Precipitation Data; Impervious Surface Summary; Land Use/Land Cover Analysis | 05-03-042appC | September 2006 |
| Appendix D: Overview of Microbial Source Tracking | 05-03-042appD | September 2006 |
| Appendix E. Fecal Coliform Loading | 05-03-042appE | September 2006 |
| Appendix F. A Modeling Study of Combined Sewer Overflows in the Port Washington Narrows and Fecal Coliform Transport in Sinclair and Dyes Inlets | 05-03-042appF | September 2006 |
| Quality Assurance Project Plan: Measuring Copper Concentrations in Two Puget Sound Marinas | 06-03-109 | September 2006 |
| Quality Assurance Project Plan: Chlorinated Pesticides, PCBs, and Dioxins in Yakima River Fish - 2006: Assessing Progress Toward TMDL Targets and Updating the Fish Consumption Advisory | 06-03-111 | September 2006 |
| Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon, Status Report, September 2005 and June 2006 | 06-03-035 | September 2006 |
| Results from Monitoring Endosulfan and Dieldrin in Wide Hollow Creek, Yakima River Drainage, 2005-06 | 06-03-038 | September 2006 |
| River and Stream Water Quality Monitoring Report for Water Year 2005 | 06-03-032 | September 2006 |
| PCBs, PBDEs, and Selected Metals in Spokane River Fish, 2005 | 06-03-025 | August 2006 |
| PBDEs Flame Retardants in Washington Rivers and Lakes: Concentrations in Fish and Water, 2005-06 | 06-03-027 | August 2006 |
| Quality Assurance Project Plan: Puyallup and White Rivers Temperature and Dissolved Oxygen Monitoring | 06-03-204 | August 2006 |
| Quality Assurance Project Plan: Old Stillaguamish River Multi-Parameter Total Maximum Daily Load Study | 06-03-108 | August 2006 |
| South Puget Sound Verification of 303(d) Listings for Chemical Contaminants in Fish and Shellfish | 06-03-026 | July 2006 |
| Shelton Laundry and Cleaners, August 2005 through May 2006 Groundwater Monitoring Results | 06-03-029 | July 2006 |
| Quality Assurance Project Plan: Snoqualmie River Temperature Total Maximum Daily Load Study | 06-03-106 | July 2006 |
| Addendum to Quality Assurance Project Plan: Shelton Laundry and Cleaners. | 02-03-078ADD | July 2006 |
| Moses Lake Phosphorus-Response Model and Recommendations to Reduce Phosphorus Loading | 06-03-011 | June 2006 |
| Zinc and Copper Concentrations in an Industrial Area Creek during Storm Events | 06-03-023 | June 2006 |
| Quality Assurance Project Plan: South Fork Palouse River Fecal Coliform Bacteria Total Maximum Daily Load Study | 06-03-105 | June 2006 |
| Spokane River PCBs Total Maximum Daily Load Study (DRAFT report) | 06-03-024 | June 2006 |
| Quality Assurance Project Plan: South Fork Palouse River Temperature Total Maximum Daily Load Study | 06-03-104 | June 2006 |
| Lower Yakima River Suspended Sediment Total Maximum Daily Load: Effectiveness Monitoring Report | 06-03-014 | May 2006 |
| Washington State Toxics Monitoring Program: Toxic Contaminants in Fish Tissue and Surface Water in Freshwater Environments, 2003 | 06-03-019 | May 2006 |
| Wenatchee River Basin Dissolved Oxygen, pH, and Phosphorus Total Maximum Daily Load Study | 06-03-018 | April 2006 |
| Quality Assurance Project Plan: Measuring Mercury Trends in Freshwater Fish in Washington State | 06-03-103 | April 2006 |
| Persistent Organic Pollutants in Feed and Rainbow Trout from Selected Trout Hatcheries | 06-03-017 | April 2006 |
| Quality Assurance Project Plan: Samish Bay Fecal Coliform Bacteria Total Maximum Daily Load Study | 06-03-102 | March 2006 |
| Tributaries to Totten, Eld, and Little Skookum Inlets - Fecal Coliform Bacteria and Temperature Total Maximum Daily Load: Water Quality Improvement Report | 06-03-007 | March 2006 |
| Preparing Elements of a Quality Assurance Monitoring Plan to Conduct Water Quality Monitoring near Dairies and CAFOs | 06-03-015 | March 2006 |
| Henderson Inlet Watershed Fecal Coliform Bacteria, Dissolved Oxygen, pH, and Temperature Total Maximum Daily Load Study | 06-03-012 | March 2006 |
| Addendum to Quality Assurance Project Plan for Surface Water Monitoring Program for Pesticides in Salmonid-Bearing Streams: Addition of Skagit-Samish Watersheds, and Extension of Program through June 2009. | 03-03-104ADD | March 2006 |
| Quality Assurance Project Plan: Vancouver Lake PCBs, Chlorinated Pesticides, and Dioxins Fish Tissue Investigation | 06-03-101 | February 2006 |
| Quality Assurance Project Plan: Willapa River Fecal Coliform Bacteria Verification Study | 06-03-202 | February 2006 |
| A Survey of Zinc Concentrations in Industrial Stormwater Runoff | 06-03-009 | January 2006 |
| Lakewood Plaza Cleaners, June and November 2005 Groundwater Monitoring Results | 06-03-010 | January 2006 |
| Post Point (Bellingham Bay) Sediment Sulfide and Toxicity Assessment | 06-03-002 | January 2006 |
| Groundwater-Surface Water Interactions along the Naches and Tieton Rivers, Summer and Fall 2004 | 06-03-003 | January 2006 |
| Native Plants for Aquatic Gardens and Aquariums: A guide for using plants native
to the Northwestern U.S. in decorative ponds and aquariums | 06-03-004 | January 2006 |
| Lake Tapps (Pierce County) Monitoring, Final Data Report | 06-03-006 | January 2006 |
| Montesano Groundwater Investigation of Leaking Underground Storage Tanks, October 2004 and March 2005 | 06-03-008 | January 2006 |
| Methoprene Concentrations in Surface Water Samples from Grant County Mosquito Control District No. 1 | 06-03-001 | January 2006 |
| American Plating Post-Interim-Action Groundwater Monitoring Results, March and August 2005 | 06-03-005 | January 2006 |
| Quality Assurance Project Plan: Lake Ballinger Total Maximum Daily Load Effectiveness Monitoring Study | 06-03-201 | January 2006 |