Nuclear Waste (85 publications 2000-2011)

Also see Nuclear Waste Home

This list updated February 10, 2012

Title (link to summary) Number      Date (released or updated)
Tank Waste Treatment News, Volume 1, Issue 411-05-014December 2011
2012 Joint Agency Request Legislation: Low-Level Radioactive Waste Site Use Permits11-05-015November 2011
Public Comment Period: Waste Water Discharge Permit for Hanford11-05-013October 2011
Public Comment Period: Design Changes in the Pretreatment Facility of the Waste Treatment Plant11-05-008October 2011
Tank Closure Topics (formerly Update: C-Farm Closure), Volume 2, Issue 211-05-012October 2011
Ventilation Upgrades for Hanford's Double-Shell Tanks: Responsiveness Summary11-05-011September 2011
Tank Waste Treatment News, Volume 1, Issue 311-05-009September 2011
Tank Waste Treatment News, Volume 1, Issue 211-05-006June 2011
State of the Hanford Site public meeting, Portland (part 1 of 3)11-05-005March 2011
State of the Hanford Site public meeting, Portland (part 3 of 3)11-05-005bMarch 2011
State of the Hanford Site public meeting, Portland (part 2 of 3)11-05-005aMarch 2011
State of the Hanford Site public meeting, Seattle (part 1 of 2)11-05-004March 2011
State of the Hanford Site public meeting, Seattle (part 2 of 2)11-05-004aMarch 2011
State of the Hanford Site public meeting, Richland (part 1 of 2)11-05-003March 2011
State of the Hanford Site public meeting, Richland (part 2 of 2)11-05-003aMarch 2011
Frequently Asked Questions - Hanford's Site-Wide Permit08-05-007February 2011
Update: C-Farm Closure, Volume 2, Issue 111-05-001January 2011
Permit Modification of the Dangerous Waste Portion, Rev 8C, of the RCRA Permit for the Treatment, Storage, and Disposal of Dangerous Waste, Part III, Operating Unit Group 10 (WA7890008967) Waste Treatment and Immobilization Plant: Responsiveness Summary11-05-002January 2011
Uranium and Other Chemical Contaminants Entering the Columbia River from the South Columbia Basin Irrigation Outfalls: A Cooperative Study by the Washington State Departments of Ecology and Health10-05-019November 2010
Corrective Action Class 3 Permit Modification of the Site-Wide Permit II.Y Conditions: Responsiveness Summary10-05-018October 2010
Tank Waste Treatment News, Volume 1, Issue 110-05-017October 2010
Update: C-Farm Closure, Volume 1, Issue 310-05-015August 2010
Focus on Blocking Strontium: All About Apatite06-05-008July 2010
Tank Closure 101: Understanding Tank Closure Standards on the Hanford Site08-05-017July 2010
Retrieving Tank Wastes at Hanford: The Basics10-05-012July 2010
TY Farm Interim Surface Barrier Demonstration Project: Responsiveness Summary10-05-009June 2010
Update: C-Farm Closure, Volume 1, Issue 210-05-014May 2010
Responsiveness Summary: Approval of a Variance to Land Disposal Restrictions at Hanford for Contaminated Beryllium10-05-011April 2010
Construction of the Lower Level of the Cover at US Ecology's Filled Trenches10-05-008April 2010
Update: C-Farm Closure, Volume 1, Issue 110-05-013February 2010
Focus on Technetium-99 Removal10-05-007February 2010
Focus on Other Tank Waste Treatment Issues10-05-006February 2010
Focus on Waste Management10-05-005February 2010
Focus on Secondary Waste10-05-004February 2010
Focus on Tank Waste Retrieval and Tank Farm Closure10-05-003February 2010
Focus on Effects of Offsite Waste at Hanford10-05-002February 2010
Focus on Low-Activity Waste Treatment Alternatives10-05-001February 2010
TY-Farm Interim Surface Barrier Demonstration Project09-05-013January 2010
Ecology's views on the Tank Closure and Waste Management Environmental Impact Statement09-05-012November 2009
Focus on Enforcement for Hanford's Cleanup08-05-003September 2009
On Tentative Approval of a Variance to Land Disposal Restrictions at Hanford -- Responsiveness Summary09-05-010September 2009
Permit Modification to the Hanford Facility Resource Conservation and Recovery Act Permit, Dangerous Waste Portion, Revision 8C, for the Treatment, Storage, and Disposal of Dangerous Waste, Part III, Operating Unit Group 10 WTP Responsiveness Summary09-05-009July 2009
Switch to Email and Help Save Resources09-05-005May 2009
Guidance for Preparing Waste Sampling and Analysis Documents and Quality Assurance/Quality Control Requirements at Nuclear Waste Sites09-05-007April 2009
US Ecology Remedial Investigation Data Workshop (OBSOLETE)09-05-006April 2009
Permit Modification to the Hanford Facility Resource Conservation and Recover Act Permit, Part III, Chapter 10, Waste Treatment and Immobilization Plant Responsiveness Summary (OBSOLETE)09-05-001March 2009
Focus on why the EIS mattters (the Tank Closure and Waste Management Environmental Impact Statement)08-05-016December 2008
Focus on Hanford Cleanup Lawsuit08-01-040November 2008
Cleaning Hanford's Groundwater08-05-001October 2008
Backup Generator for the Hanford Local Area Network Responsiveness Summary (OBSOLETE)08-05-012September 2008
Air Operating Permit Revisions of 2006 Renewal Revision D Responsiveness Summary (OBSOLETE)08-05-009July 2008
Proposed permit for air quality standards and equipment changes in Hanford's AY and AZ tank farms Responsiveness Summary (OBSOLETE)08-05-008May 2008
Regulatory Perspective, Fiscal Year 2010 Hanford Funding; Washington State Department of Ecology March 26, 200808-05-006April 2008
Diesel and Propane Heaters for Waste Treatment Plant Construction - Responsiveness Summary (OBSOLETE)07-05-010November 2007
Integrated Disposal Facility Pre-Active Life Permit Modification - Responsiveness Summary (OBSOLETE)07-05-009November 2007
Class 3 Modification -- Request to Modify the Hanford Facility Resource Conservation and Recovery Act Permit, Part III, Chapter 10, Waste Treatment and Immobilization Plant -- Responsiveness Summary (OBSOLETE)07-05-006September 2007
Hanford Site Air Operating Permit Changes Responsiveness Summary (OBSOLETE)07-05-004July 2007
Setting New Air Quality Standards - Responsiveness Summary07-05-005July 2007
106-T Interim Barrier Comment Period Responsiveness Summary (OBSOLETE)07-05-003July 2007
Replacing Emergency Diesel Pumps for Hanford's Water Supply Responsiveness Summary (OBSOLETE)07-05-002June 2007
Focus on Our Top Priorities at Hanford 200707-05-025May 2007
Washington State Department of Ecology response to comments received from Heart of America Northwest, on the "Agreed Order - US Ecology WA, Inc." (OBSOLETE)06-05-023January 2007
Responsiveness Summary: Hanford Air Operating Permit Renewal (OBSOLETE)06-05-018November 2006
300 Area Air Operating Permit Responsiveness Summary (OBSOLETE)06-05-021October 2006
Focus on Our Top Priorities at Hanford06-05-020October 2006
Responsiveness Summary: Class 2 Modification, Request to Modify the Hanford Facility Resource Conservation and Recovery Act Permit, Part III, Chapter 10, Waste Treatment and Immobilization Plant (OBSOLETE)06-05-019October 2006
Tank Waste Storage Project Information Sheet04-05-014September 2006
Facility Transition Project Information Sheet04-05-011September 2006
Waste Treatment Plant: Vitrification - Immobilizing Waste in Glass Information Sheet04-05-012September 2006
Environmental Restoration Project Information Sheet04-05--010September 2006
Waste Management Project Information Sheet04-05-013September 2006
Hydrogeology at Hanford06-05-015September 2006
Responsiveness Summary: Hanford Site Air Operating Permit Significant Modification - Remove three 100-K facilities on the Hanford Site from the Air Operating Permit (OBSOLETE)06-05-014August 2006
Responsiveness Summary: Bremerton Naval Complex Mixed Waste Storage Facility (OBSOLETE)06-05-011June 2006
Responsiveness Summary: Remove the 324 and 327 Buildings in the 300 Area of the Hanford Site from the Air Operating Permit (OBSOLETE)06-05-007May 2006
Amended 324 Building Closure Plan Responsiveness Summary (OBSOLETE)06-05-005April 2006
A Citizen's Guide: Scoping the Tank Closure & Waste Management Environmental Impact Statement06-05-002March 2006
Draft Permit for the Hanford Site Integrated Disposal Facility Responsiveness Summary (OBSOLETE)06-05-003March 2006
Hanford Waste Treatment Plant Permit Modification Responsiveness Summary (OBSOLETE)05-05-013January 2006
Hanford Air Operating Permit: Responsiveness Summary for the Downgrade of the B-Plant Status Comment Period (OBSOLETE)05-05-012January 2006
Hanford Bilingual Brochure: Hanford, the River, and You05-05-005December 2005
Cleaning Up Hanford's Groundwater02-05-0152002
Tank Waste Treatment Workshop Report00-05-009October 2000
Draft Environmental Impact Statement for the Commercial Low-Level Waste Disposal Site; Richland, Washington00-05-010August 2000
Fact Sheet for State Waste Discharge Permit ST4500005011June 2000

Last updated February 10, 2012