Publication Summary

Title

Antilon Dam and Saddle Dams Hydrologic Analysis

Month-Year PublishedApril 1991
Online Availability
not available
Short Description

In accordance with RCW 43.21A.064(2), the Dam Safety Section (DSS) conducted a periodic inspection of the AntHon Dam Project on November 6, 1990. As part of the inspection, the DSS performed a hydrologic analysis of the drainage basin to determine the adequacy of the project spillway. The following is a summary of that analysis.

Publication NumberOFTR 91-10
Author(s)Melvin Schaefer
ContactBarb Anderson, (360) 407-6607
Print Availability
Request from the program.
Number of pages 21
Keywords dam, drainage, hydrology, Inspection, water, water resource
Related Web ContentWater Resources Program

This page last updated June 26, 2008